Or. Admin. R. 340-141-0210 - Plan Maintenance and Use
(1)
At least one copy of the plan must be kept in a central location accessible at
any time by the incident commander or spill response manager named in
accordance with OAR 340-141-0140(7). Each facility covered by the plan must
possess a copy of the plan and keep it in a conspicuous and accessible
location.
(2) A field document
prepared under OAR 340-141-0130(5) must be available to all appropriate
personnel. Each covered vessel covered by the plan must possess a copy of the
field document and keep it in a conspicuous and accessible location.
(3) A facility, covered vessel, owner or
operator or their designee must implement the plan in the event of a spill. The
owner or operator of the facility or covered vessel must receive approval from
DEQ before it conducts any major aspect of the spill response contrary to the
plan unless:
(a) Such actions are necessary to
protect human health and safety;
(b) Such actions must be performed
immediately in response to unforeseen conditions to avoid additional
environmental damage; or
(c) The
plan holder has been directed to perform such actions by DEQ, EPA, Pipeline
Hazardous Materials Safety Administration (PHMSA) or the United States Coast
Guard.
Notes
Statutory/Other Authority: ORS 468.020 & 468B.345 - 468B.390
Statutes/Other Implemented: ORS 468B.345 - 468B.390