Or. Admin. Code § 690-085-0015 - Methods for Measuring and Computing Water Use
(1) Beginning October 1992, methods shall be
approved in advance by the Department except those prescribed in sections (4)
and (5) of this rule which are approved by the Department. The methods
prescribed in sections (4) and (5) of this rule are designed to meet OAR
690-085-0010(3).
Alternate methods will be accepted by the Department if the conditions
specified in section (6) of this rule are met. Any method is subject to review
by the Department.
(2) In Critical
Groundwater and Serious Water Management Areas measuring requirements may be
different. In such cases the more stringent measuring requirements will take
precedence.
(3) Where practical,
water use shall be measured at each point of diversion. However, measurements
may be taken at a reasonable distance from the point of diversion if the
following conditions are met:
(a) The measured
flow shall be corrected to reflect the flow at the point of diversion. The
correction will be based on periodic flow measurements at the point of
diversion taken in conjunction with flow measurements at the usual measuring
point;
(b) If the measured flow
includes flow contributions from more than one point of diversion, the measured
flow shall be proportioned to reflect the flow at each point of diversion using
the method prescribed in subsection (a) of this section;
(c) A description of the correction method
shall be submitted with the annual report the first time it is used and any
time it is changed, or once every five years, whichever is shorter.
(4) Approved methods for
measurements made in open channels are as follows:
(a) The following requirements apply for all
approved methods of measurement in open channels:
(A) Copies of all measurement notes, rating
curves, and calculations shall be retained for three years and made available
to the Department upon request. For each method of measurement, installation,
and measurement procedures shall be as described in the references listed in
subsection (4)(f) of this rule;
(B)
Channels shall be equipped with a staff gage and/or a continuous stage recorder
which shall be installed in a location that provides an accurate reading of the
control crest depth at all elevations and as described in the references listed
in subsection (4)(f) of this rule. If only a staff gage is installed, an
observer shall read the staff gage and record the reading at uniform intervals,
and as close as practical before and after the time regulation of the diversion
flow rate occurs. At no time shall the periodic interval be greater than three
days. A continuous stage recorder may be used in lieu of periodic staff gage
readings;
(C) The method of
measurement shall conform with the U.S. Geological Survey method for
velocity-area measurements as described in the references listed in subsection
(4)(f) of this rule;
(D) Where
practical, the rate of flow may be determined by measuring the amount of time
needed to fill a container of known capacity;
(E) For very low flows that cannot be
measured by any of the above methods, the rate of flow may be determined by
setting a portable weir or flume in the channel. The weir or flume shall be
installed as described in the references listed in subsection (4)(f) of this
rule;
(F) Once a rating curve has
been established, computation of reported monthly volume shall be as described
by references listed in subsection (4)(f) of this rule with additional
information available from the Department.
(b) The Velocity-area Method:
(A) A rating curve for the control shall be
established and maintained as described in references listed in subsection
(4)(f) of this rule. The distribution of open channel flow measurements shall
be sufficient to establish a full range of values for the entire
stage-discharge relation. Close attention shall be given to the upper end (high
flows) and the lower end (low flows) of the curve;
(B) Open channel flow measurements shall be
taken at least once every six weeks, and at any time there is a change in
channel conditions which may alter flow conditions across the
control;
(C) Readings taken from a
staff gage shall be consistent with paragraph (4)(a)(B) of this rule.
(c) The Weir Method:
(A) A weir shall be installed and maintained
as described in the references listed in subsection (4)(f) of this rule.
Upstream from the weir a staff gage and/or continuous stage recorder shall be
installed in a location that measures static head above the weir crest at all
elevations and in accordance with the references listed in subsection (4)(f) of
this rule;
(B) When only a staff
gage is installed, reading of the staff gage shall be consistent with paragraph
(4)(a)(B) of this rule;
(C) A
rating curve shall be established for the weir as prescribed for the
Velocity-area Method in paragraph (4)(b)(A) of this rule;
(D) Open channel flow measurements shall be
taken at least once every eight weeks, and at any time there is a change in
channel conditions which may alter flow conditions across the weir.
(d) The Flume Method:
(A) A flume shall be installed and maintained
as described in the references listed in subsection (4)(f) of this rule. A
staff gage and/or continuous stage recorder shall be installed upstream from
the flume in a location that measures static head and in accordance with the
references listed in subsection (4)(f) of this rule;
(B) When only a staff gage is installed
reading of the staff gage shall be consistent with paragraph (4)(a)(B) of this
rule;
(C) A rating curve shall be
established for the flume as prescribed for the Velocity-area Method in
paragraph (4)(b)(A) of this rule;
(D) Open channel flow measurements shall be
taken at least once every eight weeks, and at any time there is a change in
channel conditions which may alter flow conditions through the flume.
(e) For a diversion monitored by
the Department or a U.S. Geological Survey gaging station, it is sufficient to
report:
(A) The gaging station number if the
station is at the point of diversion; or
(B) The gaging station number and the
appropriate correction, per section (3) of this rule, for adjustment back to
the point of diversion, if the station is a reasonable distance from the point
of diversion;
(C) The current
operation of any station by the Department or U.S. Geological Survey does not
guarantee the continued operation or usage of the station for water use
reporting purposes.
(f)
The following references provide guidance and requirements for the methods and
installations prescribed in this rule:
(A)
"Measurement and Computation of Streamflow", Volumes 1 and 2, 1982, USGS WSP
2175;
(B) "Techniques of
Water-Resources Investigations of the United States Geological Survey", Book 3,
Chapters A6-A8, A10, A13, and A14;
(C)
"Water Measurement Manual",
U.S. Department of the Interior, Bureau of Reclamation.
(5) Approved methods
for measurements made in pipes are as follows:
(a) The Flow Meter Method:
(A) The flow meter shall be capable of
recording cumulative volume;
(B)
The flow meter shall be capable of measuring the full range of discharge from
the source of water for which it is to be used;
(C) The flow meter shall be installed and
maintained according to the manufacturer's specifications and in such a manner
that there shall be a full pipe of water at all times during which water is
being pumped;
(D) There shall be no
diversions of water between the source of water and the flow meter
installation;
(E) The manner in
which the flow meter has been installed is subject to inspection and approval
by the Director;
(F) In the case of
flowing artesian wells with pumps, the flow meter shall be installed in a
manner which will allow measurement of both pumped and flowing
discharge.
(b) The Power
Consumption Method:
(A) This method shall not
be used for flowing artesian wells;
(B) A power meter shall be dedicated to one
pump only;
(C) The ratio of
electric power consumption per quantity of water pumped shall be determined
annually by physically measuring the volume of water pumped during a two-hour
test. The test shall be conducted under normal operating conditions;
(D) A record of the method and equipment used
to determine the ratio of power consumption to volume of water pumped, and the
monthly power readings for each well shall be retained for three years. The
record shall be made available to the Department upon request.
(c) The Time of Operation Method:
(A) This method shall not be used for flowing
artesian wells;
(B) A meter that
accumulates operating time of the pump shall be installed and dedicated to one
pump only;
(C) The volume of water
pumped per unit time shall be determined annually by physically measuring the
flow during a two-hour test. This test shall be conducted under normal
operating conditions;
(D) A record
of the method and equipment used to determine the volume of water pumped per
unit time and the monthly accumulated operating times shall be retained for
three years. The record shall be made available to the Department upon
request.
(6)
Alternate methods for reporting water use:
(a)
An alternate method may be used if a registered professional engineer certifies
to the Department that the method will report water use within an accuracy of
plus or minus 15 percent. The governmental entity shall submit a description of
the method and the certification by the registered professional engineer to the
Department;
(b) The Department may
review any alternate method at any time and may require modification to the
method if the Department determines that the method does not accurately report
water use as required in OAR
690-085-0010(3).
Notes
Publications: The publication(s) referred to or incorporated by reference in this rule are available from the office of the agency.
Stat. Auth.: ORS 537 & ORS 540
Stats. Implemented:
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.