Or. Admin. Code § 918-550-0600 - Trip Permit Requirements
(1)
A trip permit is required to move a manufactured structure from one location to
another unless exempted under ORS
446.631 &
446.646. A person desiring a
trip permit to move a manufactured structure shall submit a completed division
approved form and a county tax certification form to the division.
(2) The county tax certification form
submitted pursuant to (1) must be signed by an authorized representative of the
appropriate county.
(3) The county
tax certification form submitted pursuant to (1) is only valid until the
expiration date indicated on the form.
(4) The expiration date for a trip permit is
either the same date as indicated on the county tax certification form or 30
days after issuance of the trip permit, whichever is sooner.
(5) In the case of a
multiple-unit-manufactured structure, a trip permit is required for each unit.
The manufactured structure trip permit fee, as provided in ORS
446.631 &
446.646 is required for each
permit issued.
(6) An issued trip
permit is valid for a single move from one situs to another as indicated on the
permit, and only until the expiration date as determined by subsection
(4).
(7) A trip permit is valid for
the owner of the structure and transporter listed on the permit.
(8) A permit may not be transferred to any
person or a different manufactured structure.
(9) A trip permit issued by the division is
not required to move a new manufactured structure to a destination outside of
Oregon. However, a trip permit is required if a manufactured structure is being
moved out of state, if the structure currently has an ownership document, or is
exempt under ORS 446.
Notes
Stat. Auth.: ORS 446.631
Stats. Implemented: ORS 446.631, 446.636 & 446.646
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.