25 Pa. Code § 273.151 - Soil erosion and sedimentation control plan
(a) The applicant shall submit a plan to
manage surface water and control erosion during all phases of construction and
operation at the proposed facility. The plan shall be based on the requirements
of Chapter 102 (relating to erosion and sediment control), §§
273.242-273.244 (relating to soil erosion
and sedimentation control; sedimentation ponds; and discharge structures) and
other applicable State and Federal requirements. Calculations indicating water
quantities shall be based on the 24-hour precipitation event by inches to be
expected once in 25 years. More stringent design standards may be required by
the Department based on the most recent edition of the United States Department
of Agriculture Soil Conservation Services' Engineering Field Manual for
Conservation Practices.
(b) The plan shall include fully dimensioned
diversion ditches, indicating length, gradient and cross section for
configuration by reach, and capacities for ditch volume by reach. The
calculations which are necessary to support design and siting shall be included
in the plan.
Notes
This section cited in 25 Pa. Code § 273.131 (relating to basic requirements).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.