25 Pa. Code § 273.163 - Modifications of leachate treatment plan
(a) If a problem identified in §
273.277 (relating to Departmental
notice and remedial action) occurs, the operator shall submit to the
Department, within 60 days, a permit modification application under §
271.222 (relating to permit
modification), with plans, designs and cross sections to modify its leachate
treatment plan.
(b) The Department
may approve permit modification applications under §
271.222 to extend, by 1 year at a
time, the 3-year limitation for leachate transportation in §
273.273(a)
(relating to leachate transportation), if the following apply:
(1) The applicant complies with §
273.162(b)
(relating to leachate treatment plan).
(2) The applicant has obtained the necessary
permits to construct and operate a leachate treatment system under §
273.272 (relating to basic
treatment methods).
(3) Leachate
transportation from the facility has not caused or contributed to surface water
or groundwater pollution.
(4) The
applicant has a valid contract for the treatment of leachate at an offsite
treatment facility for the 1 year term of the proposed permit
modification.
(5) The offsite
treatment facility to which leachate would be transported is operating in
compliance with The Clean Streams Law (35 P. S. §§ 691.1-691.1001) and regulations promulgated
thereunder, and is otherwise capable of accepting and treating leachate from
the landfill.
(6) The landfill has
a remaining permitted life, based on permitted capacity, of at least 3
years.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.