25 Pa. Code § 281.252 - Soil erosion and sedimentation control

The operator shall manage surface water and control erosion and sedimentation to:

(1) Divert surface water away from the storage and composting areas with measures and structures necessary to handle surface water flows based on a 25-year, 24-hour precipitation event, and supported by written calculations.
(2) Meet the requirements of Chapters 102 and 105 (relating to erosion and sediment control; and dam safety and waterway management).
(3) Prevent erosion to the maximum extent possible, including where possible, using revegetation.

Notes

25 Pa. Code § 281.252

This section cited in 25 Pa. Code § 281.132 (relating to soil erosion and sedimentation control plan).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.