25 Pa. Code § 289.414 - Modification of leachate treatment plan
(a) If a problem identified in §
289.457 (relating to Departmental
notice and remedial action) occurs, the operator shall submit to the
Department, within 60 days, a permit modification application under §
287.222 (relating to permit
modification), with plans, designs and cross sections to modify its leachate
treatment plan.
(b) The Department
may approve permit modification applications under §
287.222 to extend, by 1 year at a
time, the 3-year limitation for leachate transportation in §
289.453(a)
(relating to leachate transportation), if the following apply:
(1) The applicant complies with §
289.413(b)
(relating to leachate treatment plan).
(2) The applicant has obtained necessary
permits to construct and operate a leachate treatment system under §
289.452 (relating to basic
treatment methods).
(3) Leachate
transportation from the facility has not caused or contributed to violations of
the terms or conditions of the permit.
(4) The applicant has a valid contract for
the treatment of leachate at an offsite treatment facility for the 1-year term
of the proposed permit modification.
(5) The offsite treatment facility to which
leachate would be transported is operating in compliance with The Clean Streams
Law and regulations thereunder, and is otherwise capable of accepting and
treating leachate from the disposal impoundment.
(6) The disposal impoundment has a remaining
permitted life, based on permitted capacity, of at least 3 years.