25 Pa. Code § 291.401 - Additional application requirements
In addition to the requirements of Subchapter B (relating to general application requirements for the land application of residual waste), an application for a permit for land reclamation by residual waste shall include the following:
(1)
An operations map showing the location of groundwater monitoring devices that
exist or are proposed for the facility.
(2) A complete revegetation plan for the
site, including methods of site preparation, seeding mixtures and seeding
rates, that shows how the proposed facility will comply with §
291.415 (relating to
revegetation).
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.