25 Pa. Code § 88.103 - Hydrologic balance: coal processing waste dams and embankments
A dam and embankment constructed of coal processing waste or intended to impound coal processing waste, shall meet the requirement criteria established by Chapter 105 (relating to dam safety and waterway management) and the United States Natural Resources Service's Pennsylvania Field Office Technical Guide, Section IV, Standard 378, "Pond" as applicable.
Notes
The provisions of this §88.103 amended under section 5 of The Clean Streams Law (35 P.S. § 691.5); sections 4(a) and 4.2 of the Surface Mining Conservation and Reclamation Act (52 P.S. §§ 1396.4(a) and 1396.4b); section 3.2 of the Coal Refuse Disposal Control Act (52 P.S. § 30.53b); section 7(b) of The Bituminous Mine Subsidence and Land Conservation Act (52 P.S. § 1406.7(b)); and section 1920-A of The Administrative Code of 1929 (71 P.S. § 510-20).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.