25 Pa. Code § 89.21 - Erosion and sedimentation control
(a) The standards of Chapter 102 (relating to
erosion and sediment control) for designing erosion and sedimentation control
measures and facilities apply, except when made more stringent by this chapter.
If sedimentation ponds are not sized in accordance with §
102.13(d)
(Reserved), then the calculated detention
time and all supporting documentation and drawings used to establish the
detention time shall be included in the permit application.
(b) All areas disturbed by earthmoving
activities shall be permanently stabilized as soon as practicable after planned
grade is achieved.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.