30 Tex. Admin. Code § 106.263 - Routine Maintenance, Start-up and Shutdown of Facilities, and Temporary Maintenance Facilities
(a) This section
authorizes routine maintenance, start-up and shutdown of facilities, and
specific temporary maintenance facilities except as specified in subsection (b)
of this section.
(b) The following
are not authorized under this section:
(1)
construction of any new or modified permanent facility;
(2) reconstruction under 40 Code of Federal
Regulations, Part 60, New Source Performance Standards, Subpart A, §60.15
(relating to Reconstruction);
(3)
physical or operational changes to a facility which increase capacity or
production beyond previously existing performance levels or results in the
emission of a new air contaminant;
(4) facilities and sources that are de
minimis as allowed in §
116.119 of this title (relating to
De Minimis Facilities or Sources);
(5) piping fugitive emissions authorized
under a permit or another permit by rule; and
(6) any emissions associated with operations
claimed under the following sections of this chapter:
(A)
§
106.231 of this title (relating to
Manufacturing, Refinishing, and Restoring Wood Products);
(B)
§
106.351 of this title (relating to
Salt Water Disposal (Petroleum));
(C)
§
106.352 of this title (relating to
Oil and Gas Production Facilities);
(D)
§
106.353 of this title (relating to
Temporary Oil and Gas Facilities);
(E)
§
106.355 of this title (relating to
Pipeline Metering, Purging, and Maintenance);
(F)
§
106.392 of this title (relating to
Thermoset Resin Facilities);
(G)
§
106.418 of this title (relating to
Printing Presses);
(H)
§
106.433 of this title (relating to
Surface Coat Facility);
(I)
§
106.435 of this title (relating to
Classic or Antique Automobile Restoration Facility);
(J)
§
106.436 of this title (relating to
Auto Body Refinishing Facility); and
(K)
§
106.512 of this title (relating to
Stationary Engines and Turbines).
(c) The following activities and facilities
are authorized under this section:
(1)
routine maintenance activities which are those that are planned and predictable
and ensure the continuous normal operation of a facility or control device or
return a facility or control device to normal operating conditions;
(2) routine start-ups and shutdowns which are
those that are planned and predictable; and
(3) temporary maintenance facilities which
are constructed in conjunction with maintenance activities. Temporary
maintenance facilities include only the following:
(A) facilities used for abrasive blasting,
surface preparation, and surface coating on immovable fixed
structures;
(B) facilities used for
testing and repair of engines and turbines;
(C) compressors, pumps, or engines and
associated pipes, valves, flanges, and connections, not operating as a
replacement for an existing authorized unit;
(D) flares, vapor combustors, catalytic
oxidizers, thermal oxidizers, carbon adsorption units, and other control
devices used to control vent gases released during the degassing of immovable,
fixed process vessels, storage vessels, and associated piping to atmospheric
pressure, plus cleaning apparatus that will have or cause emissions;
(E) temporary piping required to bypass a
unit or pipeline section undergoing maintenance; and
(F) liquid or gas-fired vaporizers used for
the purpose of vaporizing inert gas.
(d) Emissions from routine maintenance
(excluding temporary maintenance facilities), start-up, and shutdown are:
(1) limited to 24-hour emission totals which
are less than the reportable quantities defined in §
101.1(82) of
this title (relating to Definitions) for individual occurrences;
(2) required to be authorized under Chapter
116 of this title (relating to Control of Air Pollution by Permits for New
Construction or Modification) or comply with § 101.7 and § 101.11 of
this title (relating to Maintenance, Start-up and Shutdown Reporting,
Recordkeeping, and Operational Requirements, and Demonstrations) if unable to
comply with paragraph (1) of this subsection or subsection (f) of this section;
and
(3) required to comply with
subsection (f) of this section.
(e) In addition to the emission limits in
subsection (f) of this section, specific temporary maintenance facilities as
listed in subsection (c)(3) of this section must meet the following additional
requirements:
(1) flares or vapor combustors
must meet the requirements of §106.492 of(1) and (2)(C) of this title
(relating to Flares);
(2) catalytic
oxidizers must meet the requirements of §
106.533(5)(C) of
this title (relating to Water and Soil Remediation);
(3) thermal oxidizers must meet the
requirements of §106.493(2) and (3) of this title (relating to Direct
Flame Incinerators);
(4) carbon
adsorption systems must meet the requirements of §
106.533(5)(D) of
this title;
(5) other control
devices used to control vents caused by the degassing of process vessels,
storage vessels, and associated piping must have an overall vapor collection
and destruction or removal efficiency of at least 90%;
(6) any temporary maintenance facility that
cannot meet all applicable limitations of this section must obtain
authorization under Chapter 116 of this title; and
(7) temporary maintenance facilities may not
operate at a given location for longer than 180 consecutive days or the
completion of a single project unless the facility is registered. If a single
project requires more than 180 consecutive days to complete, the facilities
must be registered using a PI-7 Form, along with documentation on the project.
Registration and supporting documentation shall be submitted upon determining
the length of the project will exceed 180 days, but no later than 180 days
after the project begins.
(f) All emissions covered by this section are
limited to, collectively and cumulatively, less than any applicable emission
limit under §
106.4(a)(1) - (3)
of this title (relating to Requirements for Permitting by Rule) in any rolling
12-month period.
(g) Facility
owners or operators must retain records containing sufficient information to
demonstrate compliance with this section and must include information listed in
paragraphs (1) - (4) of this subsection. Documentation must be separate and
distinct from records maintained for any other air authorization. Records must
identify the following for all maintenance, start-up, or shutdown activities
and temporary maintenance facilities:
(1) the
type and reason for the activity or facility construction;
(2) the processes and equipment
involved;
(3) the date, time, and
duration of the activity or facility operation; and
(4) the air contaminants and amounts which
are emitted as a result of the activity or facility operation.