Utah Admin. Code R315-270-220 - Hazardous Waste Permit Program - How May I Transfer My Rap to a New Owner or Operator?
(a) If you wish to
transfer your RAP to a new owner or operator , you shall follow the requirements
specified in your RAP for RAP modification to identify the new owner or
operator , and incorporate any other necessary requirements. These modifications
do not constitute "significant" modifications for purposes of Section
R315-270-170.
The new owner/operator shall submit a revised RAP application no later than 90
days before the scheduled change along with a written agreement containing a
specific date for transfer of RAP responsibility between you and the new
permittees.
(b) When a transfer of
ownership or operational control occurs, you as the old owner or operator shall
comply with the applicable requirements in Section
R315-264-140
through 151 until the new owner or operator has demonstrated that he is
complying with the requirements in Section
R315-264-140
through 151. The new owner or operator shall demonstrate compliance with
Section
R315-264-140
through 151 within six months of the date of the change in ownership or
operational control of the facility or remediation waste management site . When
the new owner/operator demonstrates compliance with Section
R315-264-140
through 151 to the Director , the Director shall notify you that you no longer
need to comply with Section
R315-264-140
through 151 as of the date of demonstration.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.