9 Va. Admin. Code § 25-151-80 - Stormwater pollution prevention plans
A stormwater pollution prevention plan (SWPPP) shall be developed and implemented for the facility covered by this permit. The SWPPP is intended to document the selection, design, and installation of control measures, including BMPs, to minimize the pollutants in all stormwater discharges from the facility, and to meet applicable effluent limitations and water quality standards.
The SWPPP requirements of this general permit may be fulfilled, in part, by incorporating by reference other plans or documents (i.e., a spill prevention control and countermeasure (SPCC) plan developed for the facility under § 311 of the Clean Water Act, or best management practices (BMP) programs otherwise required for the facility), provided that the incorporated plan meets or exceeds the plan requirements of Part III B. All plans incorporated by reference into the SWPPP become enforceable under this permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP of Part III B, the permittee shall develop the missing SWPPP elements and include them in the required plan.
Selection of control measures shall take into consideration:
Structural control measures may require a separate permit under § 404 of the Clean Water Act and the Virginia Water Protection Permit Program Regulation (9VAC25-210) before installation begins.
Any deficiencies in the implementation of the SWPPP that are found shall be corrected as soon as practicable, but not later than within 60 days of the inspection, unless permission for a later date is granted in writing by the director. The results of the inspections shall be documented in the SWPPP and shall include at a minimum:
All control measures identified in the SWPPP shall be maintained in effective operating condition and shall be observed at least annually when a stormwater discharge is occurring to ensure that they are functioning correctly. Where discharge locations are inaccessible, nearby downstream locations shall be observed. The observations shall be documented in the SWPPP.
If routine facility inspections required by Part III B 5 identify control measures that are not operating effectively, repairs or maintenance shall be performed before the next anticipated storm event. If maintenance before the next anticipated storm event is not possible, maintenance shall be scheduled and accomplished as soon as practicable, but not later than within 60 days of the inspection, unless permission for a later date is granted in writing by the director. In the interim, back-up measures shall be employed and documented in the SWPPP until repairs or maintenance is complete. Documentation shall be kept with the SWPPP of maintenance and repairs of control measures, including the dates of regular maintenance, dates of discovery of areas in need of repair or replacement, dates for repairs, dates that the control measures returned to full function, and the justification for any extended maintenance or repair schedules.
The director may notify the permittee at any time that the SWPPP, control measures, or other components of the facility's stormwater program do not meet one or more of the requirements of this permit. The notification shall identify specific provisions of the permit that are not being met, and may include required modifications to the stormwater program, additional monitoring requirements, and special reporting requirements. The permittee shall make any required changes to the SWPPP within 60 days of receipt of the notification, unless permission for a later date is granted in writing by the director, and shall submit a written certification to the director that the requested changes have been made.
Notes
Statutory Authority: § 62.1-44.15 of the Code of Virginia; § 402 of the Clean Water Act; 40 CFR Parts 122, 123, and 124.
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
A Stormwater pollution prevention plan (SWPPP) shall be developed and implemented for the facility covered by this permit. The SWPPP is intended to document the selection, design, and installation of control measures, including BMPs, to minimize the pollutants in all stormwater discharges from the facility, and to meet applicable effluent limitations and water quality standards.
The SWPPP requirements of this general permit may be fulfilled, in part, by incorporating by reference other plans or documents such as a spill prevention control and countermeasure (SPCC) plan developed for the facility under § 311 of the Clean Water Act, or best management practices (BMP) programs otherwise required for the facility, provided that the incorporated plan meets or exceeds the plan requirements of Part III B (Contents of the SWPPP). All plans incorporated by reference into the SWPPP become enforceable under this permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP of Part III B, the permittee shall develop the missing SWPPP elements and include them in the required plan.
c. Receiving waters and wetlands. The name of all surface waters receiving discharges from the site, including intermittent streams, dry sloughs, and arroyos. Provide a description of wetland sites that may receive discharges from the facility. If the facility discharges through a an MS4, identify the MS4 operator, and the receiving water to which the MS4 discharges.
Selection of control measures shall take into consideration:
Structural control measures may require a separate permit under § 404 of the Clean Water Act and the Virginia Water Protection Permit Program Regulation (9VAC25-210) before installation begins.
The inspection frequency shall be specified in the SWPPP based upon a consideration of the level of industrial activity at the facility, but shall be at a minimum of once per calendar quarter unless more frequent intervals are specified elsewhere in the permit or written approval is received from the department for less frequent intervals. Inspections shall be performed during operating hours. At least once each calendar year, the routine facility inspection shall be conducted during a period when a stormwater discharge is occurring.
The requirement for routine facility inspections is waived for facilities that have maintained an active VEEP E3/E4 status. Certain sectors in Part IV have additional inspection requirements. If the VEEP E3/E4 waiver language is not included for the sector specific inspections, these additional inspection requirements may not be waived.
Any deficiencies in the implementation of the SWPPP that are found shall be corrected as soon as practicable, but not later than within 60 days of the inspection, unless permission for a later date is granted in writing by the director. The results of the inspections shall be documented in the SWPPP and shall include at a minimum:
All control measures identified in the SWPPP shall be maintained in effective operating condition and shall be observed at least annually when a stormwater discharge is occurring to ensure that they are functioning correctly. Where discharge locations are inaccessible, nearby downstream locations shall be observed. The observations shall be documented in the SWPPP.
If routine facility inspections required by Part III B 5 identify control measures that are not operating effectively, repairs or maintenance shall be performed before the next anticipated storm event. If maintenance prior to the next anticipated storm event is not possible, maintenance shall be scheduled and accomplished as soon as practicable. In the interim, back-up measures shall be employed and documented in the SWPPP until repairs or maintenance is complete. Documentation shall be kept with the SWPPP of maintenance and repairs of control measures, including the dates of regular maintenance, dates of discovery of areas in need of repair or replacement, dates for repairs, dates that the control measures returned to full function, and the justification for any extended maintenance or repair schedules.
The director may notify the permittee at any time that the SWPPP, control measures, or other components of the facility's stormwater program do not meet one or more of the requirements of this permit. The notification shall identify specific provisions of the permit that are not being met, and may include required modifications to the stormwater program, additional monitoring requirements, and special reporting requirements. The permittee shall make any required changes to the SWPPP within 60 days of receipt of such notification, unless permission for a later date is granted in writing by the director, and shall submit a written certification to the director that the requested changes have been made.
Notes
Statutory Authority: § 62.1-44.15 of the Code of Virginia; § 402 of the Clean Water Act; 40 CFR Parts 122, 123, and 124.