Wash. Admin. Code § 173-186-510 - Type and frequency of drills
To receive the credit from ecology for performing a required drill, the plan holder shall conduct the following drills within each triennial cycle.
| Type of Drill | Frequency Within the Triennial Cycle | Special Instructions | Scheduling Instructions |
| Tabletop drills | 3 - One in each year of the cycle | One of the three shall involve a worst case discharge scenario. The worst case discharge scenario drill shall be conducted once every three years. | Scheduled at least 60 days in advance, except the worst case discharge scenario at least 90 days in advance. |
| Deployment drills | 6 - Two per year | These drills include notification, safety assessments, GRP and equipment deployments. | Scheduled at least 30 days in advance. |
| Ecology initiated unannounced drills | As necessary | This drill may involve testing any component of the plan, including notification procedures, deployment of personnel, boom, recovery and storage equipment, and verification of ecology approved alternative speeds. | No notice. |
| Wildlife deployment drill | 1 - One in each three-year cycle. This is an additional drill unless it is incorporated into a large multiobjective deployment drill | This drill will be a deployment of wildlife equipment and wildlife response service provider personnel. | Scheduled at least 90 days in advance. |
| Multiplan holder large scale equipment deployment drill | 1 - One in each three-year cycle | This drill may involve dedicated and nondedicated equipment, vessels of opportunity, multiple simultaneous tactics, responses to potentially non-floating oils, and the verification of operational readiness over multiple operational periods. | Scheduled at least 90 days in advance. |
(1)
Tabletop drills: Tabletop drills are intended to demonstrate a
rail plan holder's capability to manage a spill using the ICS, the SMT, and
WRSP described in the plan. Role playing shall be required in this drill.
(a) During all required tabletop drills rail
plan holders shall provide a master list of equipment and personnel identified
to fill both command post and field operations roles.
(b) Once during each three-year cycle, the
rail plan holder shall ensure that key members of the regional/national "away"
team as identified in the plan shall be mobilized in state for a tabletop
drill. However, at ecology's discretion, team members that are out-of-state may
be evaluated in out-of-state tabletop drills if ecology has sufficient notice,
an opportunity to participate in the drill planning process, and provided that
the out-of-state drills are of similar scope and scale to what would have
occurred in state. In this case, key away team members shall be mobilized in
this state at least once every six years.
(2)
Deployment drills: Rail plan
holders shall use deployment drills to demonstrate the actions they would take
in a spill, including: Notifications, safety actions, environmental assessment,
land-based tactics and equipment deployment.
(a) During the triennial cycle, deployment
drills shall include a combination of rail plan holder owned assets, contracted
PRC assets, and nondedicated assets.
(b) Rail plan holders should ensure that each
type of dedicated equipment listed in the plan and personnel responsible for
operating the equipment are tested during each triennial cycle.
(c) Rail plan holders shall design drills
that will demonstrate the ability to meet the planning standards, including
recovery systems and system compatibility and the suitability of the system for
the operating environment. Drills shall be conducted in all operating
environments that the rail plan holder could impact from spills.
(d) At least twice during a triennial cycle,
rail plan holders shall deploy a GRP or sensitive area strategy identified
within the plan.
(e) Rail plan
holders may receive credit for deployment drills conducted by PRCs if:
(i) The PRC is listed in the plan;
and
(ii) The rail plan holder
operates in the area, schedules on the drill calendar, and participates in or
observes the drill.
(3)
Unannounced drills:
Unannounced drills may be initiated by ecology when specific problems are noted
with individual rail plan holders, or randomly, to strategically ensure that
all operating environments, personnel and equipment readiness have been
adequately tested.
(a) Immediately prior to
the start of an unannounced drill, rail plan holders will be notified in
writing of the drill objectives, expectations and scenario.
(b) Rail plan holders may request to be
excused from an unannounced drill if conducting the drill poses an unreasonable
safety or environmental risk, or significant economic hardship. If the rail
plan holder is excused, ecology will conduct an unannounced drill at a future
time.
(4)
Wildlife
deployment drills: Once every three years rail plan holders shall deploy
regional mobile wildlife rehabilitation equipment and personnel necessary to
set up the wildlife rehabilitation system found in the plan.
(5) Additional large-scale multiple plan
holder equipment deployment drill requirement. At least once every three years
all plan holders must participate in a multiple plan holder deployment
exercise. The exercise location will be selected by ecology to ensure all plan
holders have the opportunity to get credit based on the areas they operate or
transit. This drill is a test of the functional ability for multiple
contingency plans to be simultaneously activated in response to a spill. This
drill may be incorporated into other drill requirements to avoid increasing the
number of drills and equipment deployments otherwise required. This deployment
may include the following objectives:
(a)
Demonstration of dedicated and nondedicated equipment and trained contracted
personnel;
(b) Demonstration of
contracted vessel of opportunity response systems and crew performing
operations appropriate to the vessel capabilities;
(c) Demonstration of multiple simultaneous
tactics which may include, but is not limited to:
(i) On-water recovery task forces made up of
complete systems which demonstrate storage, recovery, and enhanced
skimming;
(ii) Protection task
forces which deploy multiple GRPs;
(iii) Vessel and personnel decontamination
and disposal;
(iv) Deployment of
contracted aerial assessment assets and aerial observers to direct skimming
operations;
(v) Personnel and
equipment identified for night operations; and
(vi) Equipment necessary to address
situations where oils, depending on their qualities, weathering, environmental
factors, and methods of discharge, may submerge and sink.
(d) Verification of the operational readiness
during both the first six hours of a spill and over multiple operational
periods.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.