Wash. Admin. Code § 51-11C-10200 - Section C102-Alternative materials, design and methods of construction and equipment

C102.1 General. The provisions of this code are not intended to prevent the installation of any material, or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved. The code official shall have the authority to approve an alternate material, design or method of construction upon the written application of the owner or the owner's authorized agent. The code official shall first find that the proposed design is satisfactory and complies with the intent of the provisions of this code, and that the material, method or work offered is, for the purpose intended, not less than the equivalent of that prescribed in this code in quality, strength, effectiveness, fire resistance, durability, energy conservation, and safety. The code official shall respond to the applicant, in writing, stating the reasons why the alternative was approved or was not approved.

Notes

Wash. Admin. Code § 51-11C-10200
Amended by WSR 19-24-040, Filed 11/26/2019, effective 7/1/2020 Amended by WSR 22-14-091, Filed 7/1/2022, effective 7/1/2023

Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. 13-04-056, § 51-11C-10200, filed 2/1/13, effective 7/1/13.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.