Wash. Admin. Code § 51-11C-408012 - Figure C408.1.4.1-Commissioning compliance checklist

Figure C408.1.4.1 Commissioning Compliance Checklist

Project Information

Project Name:

Project Address:

Certified Commissioning Professional:

Type of ISO Certification and Number:

Supporting Documents

[SQUARE] Manuals, record documents and training have been completed or are scheduled (Section C103.6).

* Building operations and maintenance information (C103.6.2) have been submitted to the owner or scheduled date:

* Manuals (C103.6.2. 1) have been submitted to the owner or scheduled date:

* Compliance documentation (C103.6.3) has been provided to the owner or scheduled date:

* System operation training (C103.6.4) has been provided to the owner or scheduled date:

Commissioning Plan

[SQUARE] Commissioning Plan was used during construction (Section C408.1. 2)

Commissioning Report

[SQUARE] Commissioning Report has been submitted (Section C408.1. 3)

Commissioned Systems

[SQUARE] Mechanical Systems were included in the commissioning process(Section C408.2)

[SQUARE] Testing, adjusting and balancing is complete (Section C408.2. 2).

[SQUARE] There are unresolved deficiencies with the mechanical systems. These are described in the attached Commissioning Report submitted to the owner.

[SQUARE] Service Water Heating Systems were included in the commissioning process (Section C408.3)

[SQUARE] There are unresolved deficiencies with the service water heating systems. These are described in the attached Commissioning Report submitted to the owner.

[SQUARE] Controlled receptacles and lighting control systems were included in the commissioning process (Section C408.4)

[SQUARE] There are unresolved deficiencies with the electrical power and/or automatic lighting controls. These are described in the attached Commissioning Report submitted to the owner.

[SQUARE] Additional Systems included in the commissioning process (Section C408.5)

[SQUARE] There are unresolved deficiencies with systems required by Section C406 or Section C407. These are described in the attached Commissioning Report submitted to the owner.

[SQUARE] Metering Systems were included in the commissioning process (Section C408.6)

[SQUARE] There are unresolved deficiencies with the metering system. These are described in the attached Commissioning Report submitted to the owner.

[SQUARE] Refrigeration Systems were included in the commissioning process (Section C408.7)

[SQUARE] There are unresolved deficiencies with the systems required by Section C410. These are described in the attached Commissioning Report submitted to the owner.

Certification

[SQUARE] I hereby certify that all requirements for Section C408 System Commissioning have been completed in accordance with the Washington State Energy Code, including all items above.

_____________________________________________

Certified Commissioning Professional Date

[SQUARE] I hereby certify that all requirements for Section C408 System Commissioning have been completed in accordance with the Washington State Energy Code, including all items above.

_____________________________________________

Building Owner or Owner's Authorized Agent Date

Notes

Wash. Admin. Code § 51-11C-408012
Amended by WSR 16-03-072, Filed 1/19/2016, effective 7/1/2016 Amended by WSR 19-24-040, Filed 11/26/2019, effective 7/1/2020

Statutory Authority: RCW 19.27A.020, 19.27A.025 and chapters 19.27 and 34.05 RCW. 13-04-056, § 51-11C-408012, filed 2/1/13, effective 7/1/13.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.