Wash. Admin. Code § 51-11C-50600 - Section C506-Metering for existing buildings
C506.1
Existing buildings that were constructed subject to the requirements of
this section. Where new or replacement systems or equipment are
installed in an existing building that was constructed subject to the
requirements of this section, metering shall be provided for such new or
replacement systems or equipment so that their energy use is included in the
corresponding end-use category defined in Section C409.2. This includes systems
or equipment added in conjunction with additions or alterations to existing
buildings.
C506.1.1
Small existing
buildings. Metering and data acquisition systems shall be provided for
additions over 25,000 square feet to buildings that were constructed subject to
the requirements of this section, in accordance with the requirements of
Sections C409.2 and C409.3.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.