W. Va. Code R. § 164-3-3 - Allowable Construction Costs for New Construction
3.1. SBA funded allocations for the
construction of each facility will be limited through use of the maximum gross
area allowance times (X) the most current SBA approved square foot cost for
elementary, junior/middle and senior high schools.
3.2. Construction cost per square foot may be
adjusted by the SBA to reflect regional cost factors. Statewide construction
costs will be reviewed annually and may be adjusted for inflation based on
actual and projected costs of projects constructed. This information will be
reviewed, and the construction cost allowances published by July each
year.
3.3. The construction costs
allowance shall include site work, building construction cost, building
furnishings and equipment, architectural and engineering fees, construction
manager or clerk-of-the-works, survey work, geotechnical studies, radon
testing, utility connections from the building to the property line and
advertisements.
3.4. In compliance
with W. Va. Code §
18-9D-19(c), auxiliary gyms are to be included as
allowable construction costs in high schools that meet the minimum SBA
efficiency enrollments of 800 students in grades 9-12.
3.4.A Auxiliary gym spaces shall be a maximum
total of 6,000 square feet and 144,000 cubic feet.
3.4.B. Spectator seating within the allowable
6,000 square feet may be up to 1,000 square feet.
3.4.C. Approved costs for auxiliary gyms do
not include spaces for additional locker, restroom, dressing room or office
spaces.
3.4.D. SBA funds for
auxiliary gyms may not be used in conjunction with local funds to increase the
size and/or spectator capacity of an auxiliary gym to create a second spectator
gym.
3.5. In compliance
with W. Va. Code §
18-9D-19(b), comprehensive vocational facilities may be
constructed in new high schools or existing high schools that meet the minimum
SBA efficiency enrollments. The following criteria will be considered to
determine the feasibility of construction of these spaces:
3.5.A. The distance of existing vocational
facilities from the new or existing high school location.
3.5.B. The current demand of secondary
students for vocational programs and/or the condition of the existing
facilities must justify the need for additional/replacement spaces or the
renovation of existing spaces.
3.5.C. The construction of a vocational
component at a new comprehensive high school or at an existing high school must
not create an adverse effect on other county vocational students or vocational
students from other counties. The SBA does not deem the construction of any
additional vocational spaces feasible:
3.5.C.1. If it could result in the reduction
of available vocational programs at the existing school.
3.5.C.2. If it results in the inefficient use
of existing or new vocational space.
3.5.C.3. If it adversely reduces existing
vocational center operational budgets.
3.5.C.4. If it could result in the closure of
any existing county or multi-county vocational center currently serving the
student population of two or more feeder schools.
3.6. SBA Grant Funds may not be used forth
following
3.6.A Cost of issuance for local
bonds or other indebtedness.
3.6.B. Site acquisition, unusual utility
extensions, unusual site preparation cost, access highways construction of
athletic facilities.
3.6.B.1. Grant recipients
are required to coordinate site selection for construction of new schools with
the SBA prior to negotiations with seller or provider.
3.6.B.2. If it is determined by the SBA that
extensive utility costs, special footings or foundations or other site
preparation costs will consume a disproportionate amount of the building
construction cost, an alternate site must be used. However, the Authority may
consider approval of the proposed site if the grant recipient elects to provide
additional local funding to pay the cost of developing the proposed site. At
the conclusion of the site selection process, the SBA will provide a site
acceptance letter to the local board that will allow the site acquisition
process to begin.
3.6.C.
Construction or renovation of athletic facilities, computer equipment,
instructional supplies and equipment.
3.6.D. Reimbursement of salaries for county
employees. (County employees should not be utilized to work on SBA funded
construction projects).
3.6.E.
Legal fees associated with any court proceeding or property acquisition
cost.
3.6.F. Costs associated with
defense or award of an arbitration action.
3.7. Contingency allowance for each new
construction project shall be established as two percent (2%) of the
construction budget.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.