W. Va. Code R. § 38-4-7 - Design Requirements
7.1.
General Hydrologic Requirements
7.1.a.
Hydrologic Investigation: A survey shall be conducted to evaluate soil types,
land use, and slope watershed area, runoff curve number, and any of the factors
needed to establish watershed characteristics. A summary of all hydrologic and
hydraulic data compiled in the initial site investigation and used in the
analysis shall be included in table or figure form in the plan
package.
7.1.b. A stream flow
analysis shall be conducted to evaluate stream flow quantity and quality as it
affects the dam and its appurtenances.
7.1.c. Design Storm Requirements:
7.1.c.1. All dams shall be designed to meet
the following minimum hydrological criteria based upon hazard classification:
7.1.c.1.A. Class A impoundments shall be
designed for a minimum of P100 + 0.12 (PMP-P 100) inches of rainfall in six (6)
hours.
7.1.c.1.B. Class B
impoundments shall be designed for a minimum of P100 + 0.40 (PMP-P 100) inches
of rainfall in six (6) hours.
7.1.c.1.C. Class C impoundment shall be
designed for a probable maximum precipitation (PMP) of a six (6) hour or
greater event plus three feet of freeboard.
7.1.d. Antecedent Moisture Conditions: Where
applicable to the development of a hydrograph, antecedent moisture condition II
(AMC II) may be used unless a different condition class is required by the
Secretary.
7.1.e. Flood Routings:
An analysis shall be performed for the reservoir and spillways which includes
inflow hydrographs, stage storage curves, stage discharge curves, and routings.
The spillways must be able to safely discharge that portion of the design storm
that is not stored in the reservoir. If a computer analysis is used, the input
data and output results must be clearly labeled and identified. Trial
calculations or intermediate results not relevant to the final results may be
omitted from the plan package.
7.1.f. Specific Flood Routing and Storage
Requirements:
7.1.f.1. Class A dams must be
designed with an open channel spillway unless otherwise (90) percent of the
stored portion of the design storm must be discharged or removed within ten
(10) days after the storm event.
7.1.f.2. Class B dams must be designed with
either an open channel spillway only, or with an emergency spillway and a
principal spillway together. Ninety (90) percent of the stored portion of the
design storm shall be discharged or removed within ten (10) days after the
storm event.
7.1.f.3. Class C dams
may be designed in one of three ways:
7.1.f.3.A. An impoundment designed without
discharge structures shall be capable of storing a minimum of two (2) six (6)
hour duration probable maximum storms. A system shall be designed to dewater
the impoundment of the probable maximum storm in ten (10) days by pumping or by
other means. The requirements of 25.14 shall also be met.
For existing structures exceeding the minimum 2 PMP volume requirement, the dewatering system shall be installed when the containment volume is reduced to 2 PMPs.
7.1.f.3.B. An impoundment designed with a
decant or principal spillway only shall be capable of storing at least one (1)
six (6) hour duration probable maximum storm Ninety (90) percent of the stored
shall be discharged or removed within ten (10) days after the storm
event.
7.1.f.3.C. An impoundment
designed with either an open channel spillway only, or with an emergency
spillway and principal spillway together shall be capable of discharging that
portion of the six (6) hour duration probable maximum storm that cannot be
safely stored in the impoundment. Ninety (90) percent of the stored portion of
the storm shall be discharged or removed within ten (10) days after the storm
event.
7.1.g.
Surface Drainage Control: Surface drainage control devices (e.g., vegetated
slopes, benches, groin ditches, and collection channels) shall be provided as
necessary to protect the dam and its appurtenances from the effects of erosion.
Riprap or other erosion protection measures shall be included where excessive
velocity is anticipated or experienced. All surface drainage control devices
must be designed to exit safely beyond the downstream toe of the embankment in
a natural drain way and be capable of carrying the design flow without
excessive erosion. Any open channel spillway designed for less than one hundred
(100) percent probable maximum precipitation shall be provided with freeboard
above the maximum water surface as determined by the equation 1 + 0.025
vd1/3.
7.1.h. Hydraulic Considerations: Using
standard engineering practices, a hydraulic analysis shall be performed for the
spillways and surface drainage system. Typical cross section design techniques
may be used where constant shapes are encountered. All hydraulic structures
shall be designed to safely control the velocity of water in order to prevent
excessive erosion. Accepted engineering practices shall be used to design
riprap, non-flexible channel linings, bedding, and energy dissipaters.
7.1.h.1. Specific Hydraulic Requirements:
Open channels, including open channel spillways, shall be analyzed for flow
depth, velocity, non-uniform flow conditions, super-elevation, and hydraulic
jumps.
7.1.h.1.A. Stage Discharge: Where an
open channel is used as a spillway, a stage discharge rating shall be developed
using standard engineering practices for the type and shape of the spillway. In
developing the rating, increase in upstream water depth due to change in
velocity head must be considered.
7.1.h.1.B. Water Surface Profiles: Where
channel slopes or cross-sections vary and non-uniform flow conditions result, a
water surface profile may be necessary in order to analyze the channel flow
depths and the location of hydraulic jumps.
7.1.h.1.C. Hydraulic Jumps: Where hydraulic
jumps will occur, channel sidewall height shall be sufficient to contain the
jump. The channel lining shall be designed to withstand the hydraulic jump
without damage.
7.1.h.1.D. Critical
Flows: Channels shall be designed so that water will not flow at critical depth
for extended distances. In channels of varying slope or cross-sections where
non-uniform flow occurs, the transition through critical flow shall be as rapid
as possible.
7.1.h.1.E. Super
Elevation: Channel walls shall be designed to contain super elevated flows on
curves.
7.1.i. Closed Conduit Systems: Closed Conduit
Systems including principal spillways, risers and pipes shall be analyzed to
determine the controlling limits for weir, orifice, and pipe flows.
7.1.j. Risers and Drop Inlets: Risers shall
be protected with a designed trash rack and anti-vortex device. The drop inlet
shall be sized to provide a rapid transition from partial to full pipe flow
conditions.
7.1.k. Stage Discharge:
When a closed conduit system is used as a principal system, a stage discharge
rating shall be developed using standard engineering practices for weir,
orifice, and pipe flow conditions.
7.1.l. An adequate foundation and bedding
shall be designed for all pipes and risers.
7.1.m. All pipe spillways shall be designed
to provide seepage control along the conduit.
7.1.n. Use of Corrugated Metal Pipes
-Corrugated metal pipes, whether coated or uncoated, shall not be used in new
or unconstructed refuse impoundments or slurry cells. If an existing corrugated
metal pipe has developed leaks or otherwise deteriorated so as to cause the
pipe to not function properly and such deterioration constitutes a hazard to
the proper operation of the impoundment, the Secretary will require the
corrugated metal pipe to be either repaired or replaced. Provided, however,
sediment control or other water retention structures used for the treatment of
effluent and designated as Class A Dams under 3.4.b of this rule are exempt
from this prohibition.
7.1.o. The
pipe spillway shall be of sufficient strength to withstand the maximum load of
the fill above it.
7.1.p. The pipe
spillway shall be of suitable material to resist deterioration for the design
life of the facility.
7.1.q. The
pipe spillway must be designed to avoid formation of alternating partial and
full pipe flow conditions through proper selection of pipe slope and headwater
or tail water conditions.
7.1.r.
The outlet of all conduits where blockage by animals can occur must be
protected by an animal guide.
7.1.s. Landslide Potential: When locating all
hydraulic structures the potential for landslides or slope failures as
determined in the initial site investigation shall be evaluated according to
Section 10.6.