Wis. Admin. Code Department of Workforce Development § DWD 290.12 - Posting of prevailing wage rates
(1) A clearly
legible copy of the prevailing wage rate determination issued by the department
or exempted local governmental unit, together with the provisions of s.
66.0903(10) (a) and (11)
(a), 66.0904(8) (a) and (9) (a), or
103.49(2) and
(6m), 2009 Stats., shall be kept posted in at
least one conspicuous and easily accessible place on the site of each project
by the contracting state agency, owner or developer of real property, or local
governmental unit and the notice shall remain posted during the full time any
laborer, worker, mechanic or truck driver is employed on the project.
(2) If there is no appropriate site on a
project, a local governmental unit may post the prevailing wage rate
determination at the place normally used to post public notices.
(3) Before the date that work is first
performed by a minor subcontractor, a contractor or subcontractor that hires a
minor subcontractor shall provide a copy of the prevailing wage determination
for the project to the minor subcontractor.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.