020-1 Wyo. Code R. §§ 1-13 - Information Requirements Imposed Upon Exempt Activities
(a) No entity
defined as an information applicant shall commence construction activity unless
such entity has supplied the following information to the Council a reasonable
time prior to the commencement of such construction:
(i) A description of the nature and location
of the construction activity.
(ii)
The estimated time of commencement of construction and construction
time.
(iii) The estimated number
and job classifications, by calendar quarter, of the employees of the
applicant, of its contractor or subcontractor during the construction phase and
during the operating life of the facility. Such estimates shall include the
number of employees who will be utilized but who do not currently reside within
the area to be affected by the facility.
(b) For construction activities which are
exempt from the permit requirements of the Act pursuant to
W.S.
35-12-119(c), and which are
associated with an industrial facility as defined by W.S.
W.S.
35-12-102(a)(vii), the
applicant shall provide the information required by W.S.
W.S.
35-12-109(a)(iii), (iv), (v), and
(viii) at the same time that the application
for a permit for the industrial facility is filed.