020-1 Wyo. Code R. § 1-50 - General Requirements
(a)
Implementation of Requirements. Owners and/or operators shall
comply with the requirement of this Part for UST systems with field-constructed
tanks and airport hydrant systems as follows:
(i) For UST systems installed on or before
October 13, 2015, the requirements are effective according to the following
schedule:
Requirement | Effective Date |
Upgrading UST systems; general operating requirements; and operator training | October 13, 2018 |
Release detection | October 13, 2018 |
Release reporting, response, and investigation; closure; financial responsibility and notification (except as provide in paragraph (b) of this Section) | October 13, 2015 |
(ii) For UST systems installed after October
13, 2015, the requirements apply at installation.
(b) Not later than October 13, 2018, all
owners and/or operators of previously deferred UST systems shall submit a
one-time notice of tank system existence to the department using a form
developed by the department. Owners and/or operators of UST systems in use as
of October 13, 2015, shall demonstrate financial responsibility at the time of
submission of the notification form.
(c) Except as provided in Section 51, owners
and/or operators shall comply with the requirements of Parts A through E, G, L,
and N.
(d) In addition to the codes
of practice listed in Section 6, owners and/or operators may use military
construction criteria, such as the UFC3-460-01 as referenced in Section 2, when
designing, constructing, and installing airport hydrant systems and UST systems
with field-constructed tanks.