020-12 Wyo. Code R. §§ 12-8 - Plans and Specifications

(a) 2018 TSS, part 1.2-1.2.2(r), plans; 1.3-1.3(e), specifications; 1.4-1.4(m), design criteria; 1.5, revisions to approved plans; and 1.6, additional information required; are herein incorporated by reference.
(b) All plans for waterworks and treatment facilities shall also include the name of the real estate owner, the owner of the project, and the location of the project.
(c) Plans for transmission and distribution lines shall include:
(i) The information required in paragraph (a) of this Section;
(ii) A detailed plan view at a legible scale of each reach of the water line showing all existing and proposed streets, adjacent structures, physical features, and existing locations of utilities that indicates:
(A) The location and size of all water lines, valves, access manholes, air-vacuum release stations, thrust blocking, and other appurtenances; and
(B) Pertinent elevations.
(iii) Profiles of all water lines that are shown on the same sheet as the plan view at legible horizontal and vertical scales and that show:
(A) Profiles of:
(I) Existing and finished surfaces;
(II) Pipe size and material; and
(III) Valve size, material, and type.
(B) The location of all special features such as access manholes, concrete encasements, casing pipes, blowoff valves, and air-vacuum relief valves.
(iv) Special detail drawings scaled and dimensioned to show the following:
(A) The bottom of the stream, the elevation of the high- and low-water levels, and other topographical features at points where the water line:
(I) Is located within 10 feet of streams or lakes; or
(II) Crosses streams or lakes.
(B) A cross-section drawing of the pipe bedding; and
(C) Additional features of the pipe or its installation that are not otherwise covered by specifications.
(v) The location of any sewer lines within 30 feet horizontally of water lines. Sewers that cross water lines shall be shown on the profile drawings.
(d) Plans for storage tanks, pumping stations, and water treatment facilities shall show the relation of the proposed project to the remainder of the system and shall include:
(i) The information required in paragraph (a) of this Section;
(ii) The seal and signature of the Wyoming Professional Engineer providing the design;
(iii) The site location and layout including:
(A) Topographic and physical features, including embankments;
(B) The proposed arrangement of pumping or treatment units;
(C) Existing facilities;
(D) Existing and proposed piping and valving arrangements;
(E) The route to access the facility;
(F) The power supply;
(G) Fencing; and
(H) The proposed location of clearwells, waste ponds, and sludge ponds.
(iv) Schematic flow diagram(s) and hydraulic profile(s) for facility-treated water;
(v) A flow diagram for sludge and wastewater flows; and
(vi) Plan(s) and section view(s) of each treatment facility process unit with specific construction details, features, and pertinent elevations including but not limited to the following:
(A) Inlet and outlet devices;
(B) Baffles;
(C) Valves;
(D) Arrangement of automatic control devices;
(E) Mixers;
(F) Motors;
(G) Chemical feeders;
(H) Sludge scrapers;
(I) Sludge disposal; or
(J) Other mechanical devices.
(e) Plans for well construction shall include:
(i) The information required in paragraph (a) of this Section;
(ii) Assembled order, size, and length of casing and liners;
(iii) The well test method and allowable tolerance;
(iv) The locations of all caisson construction joints and porthole assemblies on drawings, if a radial water collector is proposed;
(v) From the ground surface to the total depth of the drilled borehole, the elevation and designation of geological formations, water levels, formations penetrated, and other details to describe the proposed well completely;
(vi) Screen locations, size of screen openings, and screen intervals;
(vii) The location of any blast charges, if available; and
(viii) Existing well test data, including:
(A) Test pump capacity-head characteristics;
(B) Static water level;
(C) Depth of test pump setting;
(D) Time of starting and ending each test cycle;
(E) Pumping rate;
(F) Pumping water level;
(G) Drawdown; and
(H) Water recovery rate and levels.
(f) Plans for water lines, pump stations, treatment facilities, wells, storage, or additions/modifications to existing systems or facilities shall be accompanied by technical specifications that include:
(i) The information required in paragraph (a) of this Section;
(ii) Identification of construction materials;
(iii) When applicable, the type, size, strength, operating characteristics, rating or requirements for all mechanical and electrical equipment, including machinery, valves, piping, electrical apparatus, wiring, and meters; laboratory fixtures and equipment; operating tools; special appurtenances; and chemicals;
(iv) Construction and installation procedure for materials and equipment;
(v) Requirements and tests of materials and equipment to meet design standards;
(vi) Performance tests for the operation of completed works and component units;
(vii) Specialized requirements for tests, analyses, disinfection techniques, and other special needs;
(viii) A demonstration that all water service connections will be provided with backflow prevention devices in accordance with the requirements of Section 16(m) of this Chapter; and
(ix) If technical specifications have been independently permitted by the Department for statewide use, the title, date, and permit approval identification number in lieu of providing technical specifications.

Notes

020-12 Wyo. Code R. §§ 12-8
Amended, Eff. 7/26/2023.