020-15 Wyo. Code R. §§ 15-1 - Request for Release
(a) The procedures
in this Chapter are administrative in nature and the operator shall submit and
resolve with the Division any demonstration of meeting the performance
standards of the Act, regulations, or approved permit prior to requesting bond
release. The Division shall review any such demonstrations by the operator
within the time frames required for revisions specified in Chapter 13 of these
regulations. Failure to demonstrate the required performance standards prior to
filing a request under this Chapter may be grounds for rejecting the request
and the reasons for the denial will be provided by the Adminis
trator.
(b) The operator may file a
request with the Division for the release of all or part of an area bond, an
incremental bond, or a deposit. The request shall contain the following
information:
(i) The precise location of the
land affected by legal subdivision, Section, township, range, county and
municipal corporation, if any.
(ii)
The number of acres affected.
(iii)
The permit number and the date approved.
(iv) The type and amount of bond, and type
and portion sought to be released.
(v) A map describing the location and acreage
of each type of bond release in the request, the dates of rough backfilling,
the dates of topsoil replacement and replacement depths, and the dates of
seeding.
(vi) A notarized
statement, signed by the applicant's authorized representative, which certifies
that all applicable reclamation activities have been accomplished in accordance
with the Act, the regulations, and the approved permit. Such certification
shall be submitted for each bond release application.
(c) Within 15 days of receipt of the request,
the Administrator shall determine if the request is complete, i.e., does it
contain all information required by (b) immediately above. If it is not
complete, the Administrator will promptly notify the operator of any
deficiencies. If it is complete, the Administrator will promptly notify the
operator in writing of that fact.
(d) Within 15 days of notification by the
Administrator that the request is complete, the operator shall cause notice of
the request for bond release to be published in a newspaper of general
circulation in the locality of the surface coal mining operation at least once
per week for four consecutive weeks commencing within 15 days after filing of
the completed request. The publisher's affidavit and copy of the notice shall
be promptly submitted to the Administrator. The notice shall contain
information regarding:
(i) The name of the
operator.
(ii) The information
contained in (b)(i) -(iv) above plus a description of the types and dates of
reclamation work performed and the results achieved.
(iii) The location and final date for filing
objections to and requests for a hearing on the bond or deposit release
request.
(e) Also within
15 days of notification by the Administrator that the request is complete,
letters stating the operator's intent to seek release from the bond(s) or
deposit shall be sent to:
(i) The overlying
and adjoining surface owners of record;
(ii) The county or counties in which the
operation is located and any incorporated municipality within five miles of the
permit area; and
(iii) Sewage and
water treatment authorities or water companies in the locality of the
operation.
(f) These
letters shall contain the information outlined in ( d) above. Copies of the
letters shall be promptly submitted to the Administrator.