020-21 Wyo. Code R. §§ 21-6 - Permits, Enforceability and Applications
(a) The
requirements in these regulations may be implemented through:
(i) A land application permit issued by the
Department of Environmental Quality, Water Quality Division in accordance with
these regulations;
(ii) A
construction and operation permit issued by the Department of Environmental
Quality, Water Quality Division in accordance with Chapters 11 and 3I, Wyoming
Water Quality Rules and Regulation; or
(iii) A general statewide operation permit
issued by the Water Quality Division, Department of Environmental Quality for
the Land Application of Treated Wastewater.
(b) No person shall prepare or use treated
wastewater except in accordance with the requirements of these
regulations.
(c) Applications for
permits shall be submitted to the Department of Environmental Quality, Water
Quality Division in accordance with the requirements of Chapter 3, Wyoming
Water Quality Rules and Regulations. The application materials submitted shall
be adequate to demonstrate compliance with all requirements of this part. It
shall be the responsibility of the applicant to demonstrate that the proposed
reuse of treated wastewater will not endanger public health or the
environment.
(d) The person who
prepares treated wastewater and makes it available to another person for reuse
shall provide, as part of the application required by Section
6(c), a demonstration that
all of the requirements of this chapter will be met. This will include access
restrictions, management practices, record keeping and reporting requirements
which may be the responsibility of another person who will apply the treated
wastewater. This demonstration may be in the form of either a written agreement
with the applier specifying his or her responsibilities or a separate permit
application from the applier. If the method selected is an agreement, the
agreement must cover appropriate access restrictions, management practices,
record keeping and reporting requirements of this chapter. If the method
selected is a separate permit for the applier the permit application by the
applier must address the same requirements.
(e) Any person who prepares treated
wastewater outside of the state to be applied within the state must either
obtain a permit to land apply in accordance with this chapter or provide the
wastewater to a person who has a permit.
(f) Any person who prepares treated
wastewater outside of the State of Wyoming that is to be applied to land within
the State of Wyoming and opts not to obtain a permit shall provide written
notice, prior to the initial application of treated wastewater to the reuse
site by the applier, to the Department of Environmental Quality, Water Quality
Division. The notification shall include the following:
(i) The location, by either street address or
latitude and longitude, of each reuse site;
(ii) The approximate time period the treated
wastewater will be applied to the site;
(iii) The name, address, telephone number,
and National Pollutant Discharge Elimination System permit number (if
appropriate) for the person who prepares the treated wastewater;
(iv) The name, address, telephone number of
the person who will reuse the treated wastewater; and
(v) Documentation that the requirements of
this regulation have been met.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.