020-24 Wyo. Code R. §§ 24-18 - Injection Well Operating Requirements
(a) The owner or
operator shall ensure that injection pressure does not exceed ninety percent
(90%) of the fracture pressure of the injection zone(s) to ensure that the
injection does not initiate new fractures or propagate existing fractures in
the injection zone(s).
(i) In no case may
injection pressure cause movement of injection or formation fluids in a manner
that endangers a USDW, or otherwise threatens human health, safety, or the
environment.
(ii) In no case may
injection pressure initiate fractures in the confining zones or cause the
movement of injectate or formation fluids that endangers a USDW or otherwise
threatens human health, safety, or the environment.
(b) Injection of the carbon dioxide stream
between the outermost casing protecting USDWs and the wellbore is
prohibited.
(c) The owner or
operator shall fill the annulus between the tubing and the long string casing
with a non-corrosive fluid approved by the Administrator. The owner or operator
shall maintain on the annulus a pressure that exceeds the operating injection
pressure, unless the Administrator determines that such requirement might harm
the integrity of the well or endanger USDWs.
(d) Other than during periods of well
workover or maintenance approved by the Administrator in which the sealed
tubing-casing annulus is, by necessity, disassembled for maintenance or
corrective procedures, the owner or operator shall maintain mechanical
integrity of the injection well at all times.
(e) The owner or operator shall install and
use continuous recording devices to monitor:
(i) Injection pressure; and
(ii) Injection rate, volume, and temperature
of the carbon dioxide stream.
(f) The owner or operator shall install and
use continuous recording devices to monitor the pressure on the annulus between
the tubing and the long string casing and annulus fluid volume.
(g) The owner or operator shall install,
test, and use alarms and automatic surface shut-off systems or, at the
discretion of the Administrator, use down-hole shut-off systems (e.g.,
automatic shut-off, check valves) or other mechanical devices that provide
equivalent protection, designed to alert the operator and shut-in the well when
operating parameters such as injection rate, injection pressure, or other
parameters approved by the Administrator diverge beyond ranges or gradients
specified in the permit.
(h) If an
automatic shutdown is triggered or a loss of mechanical integrity is
discovered, the owner or operator shall immediately investigate and identify as
expeditiously as possible the cause. If, upon such investigation, the well
appears to be lacking mechanical integrity, or if monitoring required under
paragraphs (e), (f), and (g) of this Section otherwise indicates that the well
may be lacking mechanical integrity, the owner or operator shall:
(i) Immediately cease injection;
(ii) Take all steps reasonably necessary to
determine whether there may have been a release of the injected carbon dioxide
stream or formation fluids into any unauthorized zone;
(iii) Notify the Administrator within
twenty-four (24) hours;
(iv)
Restore and demonstrate mechanical integrity to the satisfaction of the
Administrator as soon as practicable and prior to resuming injection;
and
(v) Notify the Administrator
when injection can be expected to resume.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.