053-2 Wyo. Code R. § 56.6407 - Circuit testing
A blasting galvanometer or other instrument designed for testing blasting circuits shall be used to test each of the following:
(a) Continuity of each electric detonator in
the blasthole prior to stemming and connection to the blasting line.
(b) Resistance of individual series or the
resistance of multiple balanced series to be connected in parallel prior to
their connection to the blasting line.
(c) Continuity of blasting lines prior to the
connection of electric detonator series.
(d) Total blasting circuit resistance prior
to connection to the power source.
NONELECTRIC BLASTING
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.