055-3 Wyo. Code R. §§ 3-47 - Surface Setbacks
(a) A well, as measured to the center of the
wellhead, and Production Facilities, as measured to the nearest edge, corner or
perimeter, shall be located no closer than five hundred feet (500') to an
existing Occupied Structure(s) as measured from the closest exterior wall or
corner of the Occupied Structure(s). It is preferable that Production
Facilities are located at a greater distance from Occupied Structure(s) where
technically feasible.
(b) The
Supervisor may approve a variance to decrease the setback requirements if:
(i) The owner(s) of an Occupied Structure(s),
as identified on county assessor tax records, waives this requirement, in
writing, on a form approved by the Commission.
(ii) Good cause is shown. If for any reason
the Supervisor shall grant or deny a variance, the owner(s) of an Occupied
Structure(s) or the Owner or Operator may request the Commission, after notice
and hearing, consider the variance.
(c) The Supervisor may approve a variance to
increase the setback requirements for good cause. If, for any reason, the
Supervisor shall grant a variance, the Owner or Operator may request the
Commission, after notice and hearing, consider the variance.
(d) If a well is not spud, a variance granted
by the Supervisor or the Commission under subsection (b) or (c) shall expire
one (1) year from the date the variance is granted.
(e) Where a Well(s), as measured to the
center of the wellhead, or Production Facilities, as measured to the nearest
edge, corner or perimeter, are proposed for location within one thousand feet
(1,000') of an existing Occupied Structure(s), as measured from the closest
exterior wall or corner of an Occupied Structure(s), the Owner or Operator
shall:
(i) Inform the owner(s) of an Occupied
Structure(s), as identified on county assessor tax records, no more than one
hundred and eighty (180) days nor less than thirty (30) days prior to the
construction of a drilling pad or site for Production Facilities, in writing,
of:
(A) The Owner or Operator name and contact
information;
(B) Its plan to drill
a new Well(s) and the estimated construction, drilling and completion
timeline;
(C) The legal location of
the Well(s), including Quarter-Quarter, Section, Township, Range,
County;
(D) The name and API Number
of the new Well(s); and
(E) A
description of the best management practices and site specific measures the
Owner or Operator plans to undertake to mitigate reasonably foreseeable impacts
to the owner(s) of Occupied Structure(s). At a minimum, the Owner or Operator
shall consider noise, light, dust, orientation of the drilling pad, and traffic
in developing its plans.
(ii) Provide for the Supervisor's review and
consideration, fifteen (15) days prior to construction of a drilling pad or
site for Production Facilities, a report which details the actions taken by the
Owner or Operator to communicate with the owner(s) of an Occupied Structure(s)
in accordance with subsection (e)(i) and any comments received from the
owners(s) of an Occupied Structure(s) regarding the best management practices
and mitigation measure to be undertaken at the location. The report shall
include the best management practices and site specific measures the Owner or
Operator will undertake to mitigate foreseeable impacts. Nothing in this
subsection is intended, and shall not be construed, to compel or to preclude
the Supervisor from requiring other site specific measures to mitigate
foreseeable impacts. The Supervisor may waive this requirement for an Owner or
Operator if the owner(s) of all Occupied Structure(s) within this zone waive
this requirement, in writing, on a form approved by the Commission.
(f) The Owner or Operator, in
consultation with the Supervisor, shall schedule meetings to facilitate
necessary information sharing with owners of Occupied Structures in an area in
which an Owner or Operator has an approved Application for Permit to Drill or
Deepen a Well (Form 1) located within one thousand feet (1,000') of an existing
Occupied Structure(s), as measured from the closest exterior wall or corner of
the Occupied Structure(s) to the center of the wellhead or nearest edge, corner
or perimeter of Production Facilities within the existing corporate limits of
an incorporated municipality or within the boundary of an existing platted
subdivision established in compliance with all applicable state and county laws
and regulations. The Owner or Operator shall notify the appropriate county
commission, by and through the county clerk's office, of any meetings scheduled
pursuant to this subsection. The Supervisor may waive this requirement for an
Owner or Operator if the owner(s) of all Occupied Structures within this zone
waive this requirement, in writing, on a form approved by the
Commission.
(g) If additional
development requiring an Application for Permit to Drill or Deepen a Well (Form
1) occurs at an existing well location, an Owner or Operator shall be required
to comply with all provisions of Chapter 3, Section 47. Surface Setbacks. (e).
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.