060-38 Wyo. Code R. §§ 38-4 - Eligible Applicants
(a) Political
subdivisions are eligible for loans for infrastructure projects. In order to
qualify for a loan, the political subdivision must be able to demonstrate the
following:
(i) A commitment to adequately
maintain the project for the duration of the loan; and
(ii) All project costs will be funded at the
time of receipt of the loan.
(b) Wyoming cities, towns, and counties are
eligible for loans for street and road projects. In order to qualify for a
loan, the city, town, or county must be able to demonstrate the following:
(i) A commitment to adequately maintain the
project for the duration of the loan;
(ii) All project costs will be funded at the
time of receipt of the loan;
(iii)
All related infrastructure, including water and sewer is or will be in place at
the time of receipt of the loan; and
(iv) No outstanding loans exist under this
Chapter for a street and road project.
(c) Wyoming Irrigation Districts and Water
Conservancy Districts are eligible for loans for replacement or major
maintenance projects of storage, diversion, transmission, and distribution
systems. In order to qualify for a loan, the district must be able to
demonstrate the following:
(i) The entity was
legally formed and approved prior to submitting an application;
(ii) The applicant has applied to all other
eligible grant or loan programs and has fully applied any awards or loans from
those programs to the project;
(iii) A commitment to adequately maintain the
project for the duration of the loan; and
(iv) All project costs will be funded at the
time of receipt of the loan.
(d) Airport Boards that have been legally
formed and approved are eligible for loans for Airport Projects.
(e) Ownership of Project.
(i) For applicants qualifying under
Subsections (a), (b) and (d) of this Section, the applicant must own the
project in its entirety.
(ii) For
applicants qualifying under Subsection (c) of this Section, the applicant must
either own the project in its entirety or hold a valid lease for all parts of
the project that:
(A) Permits the applicant to
perform the proposed work; and
(B)
Is for an indefinite term or a term covering the useful life of the
project.
(f)
Applicants must be compliant with all applicable reporting requirements of the
Wyoming Department of Audit and Wyoming Department of Revenue prior to the
application being considered by the Board.