561 U.S. 139

MONSANTO CO. etal. v . GEERTSON SEED FARMS etal.

certiorari to the united states court of appeals for the ninth circuit


No. 09475.Argued April 27, 2010Decided June 21, 2010

The Plant Protection Act (PPA) provides that the Secretary of the Department of Agriculture may issue regulations to prevent the introduction of plant pests into the United States or the dissemination of plant pests within the United States. 7 U.S.C. 7711(a). Pursuant to that grant of authority, the Animal and Plant Health Inspection Service (APHIS) promulgated regulations that presume genetically engineered plants to be plant pestsand thus regulated articles under the PPAuntil APHIS determines otherwise. However, any person may petition APHIS for a determination that a regulated article does not present a plant pest risk and therefore should not be subject to the applicable regulations. APHIS may grant such a petition in whole or in part.

In determining whether to grant nonregulated status to a genetically engineered plant variety, APHIS must comply with the National Environmental Policy Act of 1969 (NEPA), which requires federal agencies to the fullest extent possible to prepare a detailed environmental impact statement (EIS) for every major Federal actio[n] significantly affecting the quality of the human environment. 42 U.S.C. 4332(2)(C). The agency need not complete an EIS if it finds, based on a shorter statement known as an environmental assessment (EA), that the proposed action will not have a significant environmental impact.

This case involves a challenge to APHISs decision to approve the unconditional deregulation of Roundup Ready Alfalfa (RRA), a variety of alfalfa that has been genetically engineered to tolerate the herbicide Roundup. Petitioners are the owner and the licensee of the intellectual property rights to RRA. In response to petitioners deregulation request, APHIS prepared a draft EA and solicited public comments on its proposed course of action. Based on its EA and the comments submitted, the agency determined that the introduction of RRA would not have any significant adverse impact on the environment. Accordingly, APHIS decided to deregulate RRA unconditionally and without preparing an EIS. Respondents, conventional alfalfa growers and environmental groups, filed this action challenging that decision on the ground that it violated NEPA and other federal laws. The District Court held, inter alia, that APHIS violated NEPA when it deregulated RRA without first completing a detailed EIS. To remedy that violation, the court vacated the agencys decision completely deregulating RRA; enjoined APHIS from deregulating RRA, in whole or in part, pending completion of the EIS; and entered a nationwide permanent injunction prohibiting almost all future planting of RRA during the pendency of the EIS process. Petitioners and the Government appealed, challenging the scope of the relief granted but not disputing that APHISs deregulation decision violated NEPA. The Ninth Circuit affirmed, concluding, among other things, that the District Court had not abused its discretion in rejecting APHISs proposed mitigation measures in favor of a broader injunction.

Held:

1.Respondents have standing to seek injunctive relief, and petitioners have standing to seek this Courts review of the Ninth Circuits judgment affirming the entry of such relief. Pp.714.

(a)Petitioners have constitutional standing to seek review here. Article III standing requires an injury that is (i) concrete, particularized, and actual or imminent, (ii) fairly traceable to the challenged action, and (iii) redressable by a favorable ruling. See Horne v. Flores , 557 U.S. ___, ___. Petitioners satisfy all three criteria. Petitioners are injured by their inability to sell or license RRA to prospective customers until APHIS completes the EIS. Because that injury is caused by the very remedial order that petitioners challenge on appeal, it would be redressed by a favorable ruling from this Court. Respondents nevertheless contend that petitioners lack standing because their complained-of injury is independently caused by a part of the District Courts order that petitioners failed to challenge, the vacatur of APHISs deregulation decision. That argument fails for two independent reasons. First, one of the main disputes between the parties throughout this litigation has been whether the District Court should have adopted APHISs proposed judgment, which would have replaced the vacated deregulation decision with an order expressly authorizing the continued sale and planting of RRA. Accordingly, if the District Court had adopted APHISs proposed judgment, there would still be authority for the continued sale of RRA notwithstanding the District Courts vacatur, because there would, in effect, be a new deregulation decision. Second, petitioners in any case have standing to challenge the part of the District Courts order enjoining a partial deregulation. Respondents focus their argument on the part of the judgment that enjoins planting, but the judgment also states that before granting the deregulation petition, even in part, the agency must prepare an EIS. That part of the judgment inflicts an injury not also caused by the vacatur. Pp.711.

(b)Respondents have constitutional standing to seek injunctive relief from the complete deregulation order at issue here. The Court disagrees with petitioners argument that respondents have failed to show that any of them is likely to suffer a constitutionally cognizable injury absent injunctive relief. The District Court found that respondent farmers had established a reasonable probability that their conventional alfalfa crops would be infected with the engineered Roundup Ready gene if RRA were completely deregulated. A substantial risk of such gene flow injures respondents in several ways that are sufficiently concrete to satisfy the injury-in-fact prong of the constitutional standing analysis. Moreover, those harms are readily attributable to APHISs deregulation decision, which gives rise to a significant risk of gene flow to non-genetically-engineered alfalfa varieties. Finally, a judicial order prohibiting the planting or deregulation of all or some genetically engineered alfalfa would redress respondents injuries by eliminating or minimizing the risk of gene flow to their crops. Pp.1114.

2.The District Court abused its discretion in enjoining APHIS from effecting a partial deregulation and in prohibiting the planting of RRA pending the agencys completion of its detailed environmental review. Pp.1422.

(a)Because petitioners and the Government do not argue otherwise, the Court assumes without deciding that the District Court acted lawfully in vacating the agencys decision to completely deregulate RRA. The Court therefore addresses only the injunction prohibiting APHIS from deregulating RRA pending completion of the EIS, and the nationwide injunction prohibiting almost all RRA planting during the pendency of the EIS process. P.14.

(b)Before a court may grant a permanent injunction, the plaintiff must satisfy a four-factor test, demonstrating: (1) that it has suffered an irreparable injury; (2) that remedies available at law, such as monetary damages, are inadequate to compensate for that injury; (3) that, considering the balance of hardships between the plaintiff and defendant, a remedy in equity is warranted; and (4) that the public interest would not be disserved by a permanent injunction. eBay Inc. v. MercExchange, L.L.C. , 547 U.S. 388. This test fully applies in NEPA cases. See Winter v. Natural Resources Defense Council, Inc., 555 U.S. ___, ___. Thus, the existence of a NEPA violation does not create a presumption that injunctive relief is available and should be granted absent unusual circumstances. Pp.1516.

(c)None of the four factors supports the District Courts order enjoining APHIS from partially deregulating RRA during the pendency of the EIS process. Most importantly, respondents cannot show that they will suffer irreparable injury if APHIS is allowed to proceed with any partial deregulation, for at least two reasons. First, if and when APHIS pursues a partial deregulation that arguably runs afoul of NEPA, respondents may file a new suit challenging such action and seeking appropriate preliminary relief. Accordingly, a permanent injunction is not now needed to guard against any present or imminent risk of likely irreparable harm. Second, a partial deregulation need not cause respondents any injury at all; if its scope is sufficiently limited, the risk of gene flow could be virtually nonexistent. Indeed, the broad injunction entered below essentially pre-empts the very procedure by which APHIS could determine, independently of the pending EIS process for assessing the effects of a complete deregulation, that a limited deregulation would not pose any appreciable risk of environmental harm. Pp.1623.

(d)The District Court also erred in entering the nationwide injunction against planting RRA, for two independent reasons. First, because it was inappropriate for the District Court to foreclose even the possibility of a partial and temporary deregulation, it follows that it was inappropriate to enjoin planting in accordance with such a deregulation decision. Second, an injunction is a drastic and extraordinary remedy, which should not be granted as a matter of course. See, e.g. , Weinberger v. Romero-Barcelo , 456 U.S. 305. If, as respondents now concede, a less drastic remedy (such as partial or complete vacatur of APHISs deregulation decision) was sufficient to redress their injury, no recourse to the additional and extraordinary relief of an injunction was warranted. Pp.2324.

(e)Given the District Courts errors, this Court need not address whether injunctive relief of some kind was available to respondents on the record below. Pp.2425.

570 F.3d 1130, reversed and remanded.

Alito, J., delivered the opinion of the Court, in which Roberts, C.J., and Scalia, Kennedy, Thomas, Ginsburg, and Sotomayor, JJ., joined. Stevens, J., filed a dissenting opinion. Breyer, J., took no part in the consideration or decision of the case.

MONSANTO COMPANY, etal ., PETITIONERS v.
GEERTSON SEED FARMS etal .

on writ of certiorari to the united states court of appeals for the ninth circuit


[June 21, 2010]

Justice Stevens , dissenting.

The Court does not dispute the District Courts critical findings of fact: First, Roundup Ready Alfalfa (RRA) can contaminate other plants. See App. to Pet. for Cert. 38a, 54a, 62a. Second, even planting in a controlled setting had led to contamination in some instances. See id., at 69a70a. Third, the Animal and Plant Health Inspection Service (APHIS) has limited ability to monitor or enforce limitations on planting. See id., at 70a. And fourth, genetic contamination from RRA could decimate farmers livelihoods and the American alfalfa market for years to come. See id., at 71a; see also id., at 29a30a. Instead, the majority faults the District Court for enjoining APHIS from partially deregulating RRA. Ante , at 16.

In my view, the District Court may not have actually ordered such relief, and we should not so readily assume that it did. Regardless, the District Court did not abuse its discretion when, after considering the voluminous record and making the aforementioned findings, it issued the order now before us.

I

To understand the District Courts judgment, it is necessary to understand the background of this litigation. Petitioner Monsanto Company (Monsanto) is a large corporation that has long produced a weed killer called Roundup. After years of experimentation, Monsanto and co-petitioner Forage Genetics International (FGI) genetically engineered a mutation in the alfalfa genome that makes the plant immune to Roundup. Monsanto and FGIs new product, RRA, is the first crop that has been engineered to resist a[n] herbicide and that can transmit the genetically engineered gene to other plants. See App. to Pet. for Cert. 45a.

In 2004, in the midst of a deregulatory trend in the agricultural sector, petitioners asked APHIS to deregulate RRA, thereby allowing it to be sold and planted nationwide. App. 101a. Rather than conducting a detailed analysis and preparing an environmental impact statement (EIS), as required by the National Environmental Policy Act of 1969 (NEPA) for every major Federal actio[n] significantly affecting the quality of the human environment, 42 U.S.C. 4332(2)(C), APHIS merely conducted an abbreviated environmental assessment (EA). During the 6-month period in which APHIS allowed public comment on its EA, the agency received 663 comments, 520 of which opposed deregulation. App. to Pet. for Cert. 29a. Farmers and scientists opined that RRA could contaminate alfalfa that has not been genetically modified, destroying the American export market for alfalfa and, potentially, contaminating other plants and breeding a new type of pesticide-resistant weed. Id., at 29a30a.

Despite substantial evidence that RRA genes could transfer to other plants, APHIS issued a Finding of No Significant Impact and agreed to deregulate RRA unconditionally, ante , at 4. With no EIS to wait for and no regulation blocking its path, petitioners began selling RRA. Farmers and environmental groups swiftly brought this lawsuit to challenge APHISs decision to deregulate, raising claims under NEPA and other statutes.

The District Court carefully reviewed a long record and found that APHISs reasons for concluding that the risks of genetic contamination are low were not convincing. App. to Pet. for Cert. 38a. A review of APHISs internal documents showed that individuals within the agency warned that contamination might occur. APHIS rested its decision to deregulate on its assertion that contamination risk is not significant because it is the organic and conventional farmers responsibility to protect themselves and the environment. Ibid . Yet the agency drew this conclusion without having investigated whether such farmers can, in fact, protect their crops from contamination. Ibid. The District Court likewise found that APHISs reasons for disregarding the risk of pesticide-resistant weeds were speculative and not convincing. Id. , at 46a. The agency had merely explained that if weeds acquire roundup resistance, farmers can use [a]lternative herbicides. Ibid. In light of the acknowledged risk of RRA gene transmission and the potential impact on the development of Roundup resistant weeds, the court concluded that there was a significant possibility of serious environmental harm, and granted summary judgment for the plaintiffs. Id. , at 54a; see also id. , at 45a.

At this point, the question of remedy arose. The parties submitted proposed final judgments, and several corporations with an interest in RRA, including Monsanto, sought permission to intervene. The District Court granted their motion and agreed to give them the opportunity to present evidence to assist the court in fashioning the appropriate scope of whatever relief is granted. Id., at 54a (internal quotation marks omitted).

While the District Court considered the proposed judgments, it issued a preliminary injunction. Ordinarily, the court explained, the remedy for failure to conduct an EIS is to vacate the permit that was unlawfully giventhe result of which, in this case, would be to prohibit any use of RRA. See id. , at 55a; see also id. , at 65a. But this case presented a special difficulty: Following APHISs unlawful deregulation order, some farmers had begun planting genetically modified RRA. Id. , at 55a. In its preliminary injunction, the District Court ordered that no new RRA could be planted until APHIS completed the EIS or the court determined that some other relief was appropriate. But, so as to protect these farmers, the court declined to prohibit them from harvesting, using, or selling any crops they had already planted. Id. , at 56a. And to minimize the harm to those growers who intend to imminently plant Roundup Ready alfalfa, the court permitted [t]hose growers who intend to plant [RRA] in the next three weeks and have already purchased the seed to go ahead and plant. Id. , at 58a (emphasis deleted). Essentially, the court grandfathered in those farmers who had relied, in good faith, on APHISs actions.

Before determining the scope of its final judgment, the District Court invited the parties and intervenors to submit whatever additional evidence they wish[ed] to provide, and it scheduled additional oral argument. Id. , at 58a59a. The parties submitted competing proposals for permanent injunctive relief. Id., at 60a. The plaintiffs requested that no onenot even the grandfathered-in farmersbe allowed to plant, grow, or harvest RRA until the full EIS had been prepared. Id. , at 64a. APHIS and the intervenors instead sought a remedy that would facilitat[e] the continued and dramatic growth of RRA: a partial deregulation order that would permit planting subject to certain conditions, such as specified minimum distances between RRA and conventional alfalfa and special cleaning requirements for equipment used on the genetically modified crop. See id. , at 60a64a.

The court adopted a compromise. First, it declined to adopt the APHIS-Monsanto proposal. APHIS itself had acknowledged that gene transmission could and had occurred, and that RRA could result in the development of Roundup-resistant weeds. Id. , at 61a62a. In light of the substantial record evidence of these risks, the court would not agree to a nationwide planting scheme without the benefit of the development of all the relevant data, as well as public comment about whether contamination could be controlled. Id. , at 68a. The partial deregulation proposed by petitioners, the court noted, was really deregulation with certain conditions, id. , at 69awhich, for the same reasons given in the courts earlier order, requires an EIS, ibid. The court pointed out numerous problems with the APHIS-Monsanto proposal. Neither APHIS nor Monsanto had provided evidence that suggests whether, and to what extent, the proposed interim conditions would actually be followed, and comparable conditions had failed to prevent contamination in certain limited settings. Id. , at 69a70a. APHIS, moreover, conceded that it does not have the resources to inspect the RRA that had already been planted, and so could not possibly be expected to adequately monitor the more than one million acres of [RRA] intervenors estimate [would] be planted under their proposal. Ibid. That was especially problematic because any plan to limit contamination depended on rules about harvesting, and farmers were unlikely to follow those rules. Id. , at 71a. APHIS ha[d] still not made any inquiry into numerous factual concerns raised by the court in its summary judgment order issued several months earlier. Id. , at 70a.

Next, the court rejected the plaintiffs proposed remedy of enjoin[ing] the harvesting and sale of already planted RRA. Id. , at 76a. Although any planting or harvesting of RRA poses a contamination risk, the court reasoned that the equities were different for those farmers who had already invested time and money planting RRA in good-faith reliance on APHISs deregulation order. And small amounts of harvesting could be more easily monitored. Rather than force the farmers to tear up their crops, the court imposed a variety of conditions on the crops handling and distribution. Id. , at 77a.

As to all other RRA, however, the court sided with the plaintiffs and enjoined planting during the pendency of the EIS. Balancing the equities, the court explained that the risk of harm was great. [C]ontamination cannot be undone; it will destroy the crops of those farmers who do not sell genetically modified alfalfa. Id., at 71a. And because those crops cannot be replanted for two to four years, that loss will be even greater. Ibid. On the other side of the balance, the court recognized that some farmers may wish to switch to genetically modified alfalfa immediately, and some companies like Monsanto want to start selling it to them just as fast. But, the court noted, RRA is a small percentage of those companies overall business; unsold seed can be stored; and the companies have [no] cause to claim surprise as to any loss of anticipated revenue, as they were aware of plaintiffs lawsuit and nonetheless chose to market RRA. Id. , at 72a.

Thus, the District Court stated that it would vacat[e] the June 2005 deregulation decision; enjoi[n] the planting of [RRA] in the United States after March 30, 2007, the date of the decision, pending the governments completion of the EIS and decision on the deregulation petition; and impose conditions on the handling and identification of already-planted [RRA]. Id. , at 79a. On the same day, the court issued its judgment. In relevant part, the judgment states:

The federal defendants June 14, 2005 Determination of Nonregulated Status for [RRA] is VACATED. Before granting Monsantos deregulation petition, even in part, the federal defendants shall prepare an [EIS]. Until the federal defendants prepare the EIS and decide the deregulation petition, no [RRA] may be planted. [RRA already] planted before March 30, 2007 may be grown, harvested and sold subject to the following conditions. Id. , at 108a109a.

II

Before proceeding to address the Courts opinion on its own terms, it is important to note that I have reservations about the validity of those terms. The Court today rests not only the bulk of its analysis but also the primary basis for our jurisdiction on the premise that the District Court enjoined APHIS from partially deregulating RRA in any sense. See ante , at 911, 1623. 1 That is a permissible, but not necessarily correct, reading of the District Courts judgment.

So far as I can tell, until petitioners reply brief, neither petitioners nor the Government submitted to us that the District Court had exceeded its authority in this manner. And, indeed, the Government had not raised this issue in any court at all. Petitioners did not raise the issue in any of their three questions presented or in the body of their petition for a writ or certiorari. And they did not raise the issue in their opening briefs to this Court. Only after respondents alleged that Monsantos injury would not be redressed by vacating the injunction, insofar as RRA would still be a regulated article, did petitioners bring the issue to the Courts attention. Explaining why they have a redressable injury, petitioners alleged that the District Courts order prevents APHIS from implement[ing] an[y] interim solution allowing continued planting. Reply Brief for Petitioners 5. APHIS, the party that the Court says was wrongly barred from pursuing any deregulation, even in accordance with the procedures established by law, ante , at 19, did not complain about this aspect of the District Courts order even in its reply brief.

Thus, notwithstanding that petitioners adequately preserved their objection that the vacated deregulation decision should have been replaced by APHISs proposed injunction, ante , at 8 (emphasis added), the key legal premise on which the Court decides this case was never adequately presented . Of course, this is not standardor soundjudicial practice. See Kumho Tire Co. v. Carmichael , 526 U.S. 137, 159 (1999) ( Stevens , J., concurring in part and dissenting in part). Todays decision illustrates why, for it is quite unclear whether the Courts premise is correct, and the Court has put itself in the position of deciding legal issues without the aid of briefing.

In my view, the District Courts judgment can fairly be read to address only (1) total deregulation orders of the kind that spawned this lawsuit, and (2) the particula r partial deregulation order proposed to the court by APHIS. This interpretation of the judgment is more consistent with the District Courts accompanying opinion, which concluded by stating that the court will enter a final judgment ordering the government to prepare an EIS before [the court] makes a decision on Monsantos deregulation petition. App. to Pet. for Cert. 79a. The language of that opinion does not appear to ba[r] the agency from pursuing any deregulationno matter how limited, ante , at 19 (emphasis deleted). This interpretation is also more consistent with APHISs own decision not to contest what, according to the Court, was an unprecedented infringement on the agencys statutory authority.

To be sure, the District Courts judgment is somewhat opaque. But it is troubling that we may be asserting jurisdiction and deciding a highly factbound case based on nothing more than a misunderstanding. It is also troubling that we may be making law without adequate briefing on the critical questions we are passing upon. I would not be surprised if on remand the District Court merely clarified its order.

III

Even assuming that the majority has correctly interpreted the District Courts judgment, I do not agree that we should reverse the District Court.

At the outset, it is important to observe that when a district court is faced with an unlawful agency action, a set of parties who have relied on that action, and a prayer for relief to avoid irreparable harm, the court is operating under its powers of equity. In such a case, a courts function is to do equity and to mould each decree to the necessities of the particular case. Hecht Co. v. Bowles , 321 U.S. 321, 329 (1944) . Flexibility and practicality are the touchtones of these remedial determinations, as the public interest, private needs, and competing private claims must all be weighed and reconciled against the background of the courts own limitations and its particular familiarity with the case. Id., at 329330. 2

When a district court takes on the equitable role of adjusting legal obligations, we review the remedy it crafts for abuse of discretion. [D]eference, we have explained, is the hallmark of abuse-of-discretion review. General Elec. Co. v. Joiner , 522 U.S. 136, 143 (1997) . Although equitable remedies are not left to a trial courts inclination, they are left to the courts judgment. Albemarle Paper Co. v. Moody , 422 U.S. 405, 416 (1975) (quoting United States v. Burr , 25 F.Cas. 30, 35 (No. 14,692d) (CC Va. 1807) (Marshall, C.J.)). The principles set forth in applicable federal statutes may inform that judgment. See United States v. Oakland Cannabis Buyers Cooperative , 532 U.S. 483, 497 (2001) ([A] court sitting in equity cannot ignore the judgment of Congress, deliberately expressed in legislation (internal quotation marks omitted)). And historically, courts have had particularly broad equitable powerand thus particularly broad discretionto remedy public nuisances and other purprestures upon public rights and properties, Mugler v. Kansas , 123 U.S. 623, 672 (1887) , 3 which include environmental harms. 4

In my view, the District Court did not unreasonably exercis[e] its discretion, Bennett v. Bennett , 208 U.S. 505, 512 (1908) , even if it did categorically prohibit partial deregulation pending completion of the EIS. Rather, the District Courts judgment can be understood as either of two reasonable exercises of its equitable powers.

Equitable Application of Administrative Law

First, the District Courts decision can be understood as an equitable application of administrative law. Faced with two different deregulation proposals, the District Court appears to have vacated the deregulation that had already occurred, made clear that NEPA requires an EIS for any future deregulation of RRA, and partially stayed the vacatur to the extent it affects farmers who had already planted RRA. 5

Under NEPA, an agency must prepare an EIS for every major Federal actio[n] significantly affecting the quality of the human environment. 42 U.S.C. 4332(2)(C). Recall that the District Court had found, on the basis of substantial evidence, that planting RRA can cause genetic contamination of other crops, planting in controlled settings had led to contamination, APHIS is unable to monitor or enforce limitations on planting, and genetic contamination could decimate the American alfalfa market. In light of that evidence, the court may well have concluded that any deregulation of RRA, even in a limited geographic area with stringent regulations governing harvesting and distribution, 6 ante , at 1920, requires an EIS under NEPA. See generally D. Mandelker, NEPA Law and Litigation 8:338:48 (2d ed. 2009) (describing when an EIS is required); cf. Marsh v. Oregon Natural Resources Council , 490 U.S. 360, 371 (1989) (NEPA embodies sweeping commitment to environmental safety and principle that the agency will not act on incomplete information, only to regret its decision after it is too late to correct). Indeed, it appears that any deregulation of a genetically modified, herbicide-resistant crop that can transfer its genes to other organisms and cannot effectively be monitored easily fits the criteria for when an EIS is required. 7 That is especially so when, as in this case, the environmental threat is novel. See Winter v. Natural Resources Defense Council, Inc. , 555 U.S. ___, ___ (2008) (slip op., at 13) (EIS is more important when party is conducting a new type of activity with completely unknown effects on the environment). 8

Moreover, given that APHIS had already been ordered to conduct an EIS on deregulation of RRA, the court could have reasonably feared that partial deregulation would undermine the agencys eventual decision. Courts confronted with NEPA violations regularly adopt interim measures to maintain the status quo, particularly if allowing agency action to go forward risks foreclosing alternative courses of action that the agency might have adopted following completion of an EIS. See D. Mandelker, NEPA Law and Litigation 4:61. The applicable regulations, to which the District Court owed deference, 9 provide that during the preparation of an EIS, no action concerning the [agencys] proposal shall be taken which would [h]ave an adverse environmental impact or [l]imit the choice of reasonable alternatives. 40 CFR 1506.1(a) (2009). As exemplified by the problem of what to do with farmers who had already purchased or planted RRA prior to the District Courts judgment, even minimal deregulation can limit future regulatory options. Courts must remember that in many cases allowing an agency to proceed makes a mockery of the EIS process, converting it from analysis to rationalization. Herrmann, Injunctions for NEPA Violations: Balancing the Equities, 59 U. Chi. L.Rev. 1263, 1289 (1992); see also see 40 CFR 1502.5 (EIS should be implemented in manner assuring it will not be used to rationalize or justify decisions already made).

Although the majority does not dispute that the District Court could have reasonably concluded that NEPA requires an EIS for even partial deregulation of RRA, it suggests that any such conclusion would have been incompatible with the courts decision to permit limited harvesting by farmers who had already planted RRA. See ante , at 20. 10 I do not see the inconsisten[cy]. Ibid . NEPA does not apply to actions by federal courts. See 40 CFR 1508.12. Exercising its equitable discretion to balance the interests of the parties and the public, the District Court would have been well within its rights to find that NEPA requires an EIS before the agency grants Monsantos deregulation petition, even in part, App. to Pet. for Cert. 108a, yet also to find that a partial stay of the vacatur was appropriate to protect the interests of those farmers who had already acted in good-faith reliance on APHIS.

Similarly, I do not agree that the District Courts ruling was premature because APHIS had not yet effected any partial deregulations, ante , at 19. Although it is for the agency to decide whether and to what extent it will pursue deregulation, ante , at 17, the courts application of NEPA to APHISs regulation of RRA might have controlled any deregulation during the pendency of the EIS. Petitioners and APHIS had already come back to the court with a proposed partial deregulation order which, the court explained, was incompatible with its determination that there is a substantial risk of gene spreading and that APHIS lacks monitoring capacity. That same concern would apply to any partial deregulation order. The court therefore had good reason to make it clear, upfront, that the parties should not continue to expend resources proposing such orders, instead of just moving ahead with an EIS. Cf. Railroad Commn of Tex. v. Pullman Co. , 312 U.S. 496, 500 (1941) (The resources of equity are equal to an adjustment that will avoid the waste of a tentative decision). Indeed, it was APHIS itself that sought to streamline the process. Ante , at 18.

Injunctive Relief

Second, the District Courts judgment can be understood as a reasonable response to the nature of the risks posed by RRA. Separate and apart from NEPAs requirement of an EIS, these risks were sufficiently serious, in my view, that the courts injunction was a permissible exercise of its equitable authority.

The District Court found that gene transfer can and does occur, and that if it were to spread through open land the environmental and economic consequences would be devastating. Cf. Amoco Production Co. v. Gambell , 480 U.S. 531, 545 (1987) (Environmental injury, by its nature, can seldom be adequately remedied by money damages and is often permanent or at least of long duration, i.e. , irreparable). Although a mere possibility of a future nuisance will not support an injunction, courts have never required proof that the nuisance will occur; rather, it is sufficient that the risk of its happening is greater than a reasonable man would incur. 5 J. Pomeroy, A Treatise on Equity Jurisprudence and Equitable Remedies, 1937 (523), p.4398 (2d ed. 1919). Once gene transfer occurred in American fields, it would be difficultif not impossibleto reverse the harm. Hollingsworth v. Perry , 558 U.S. __, __ (2010) (per curiam) (slip op., at 12).

Additional considerations support the District Courts judgment. It was clear to the court that APHIS had only limited capacity to monitor planted RRA, and some RRA had already been planted. The marginal threat posed by additional planting was therefore significant. Injunctive remedies are meant to achieve a nice adjustment and reconciliation between the competing claims of injury by mould[ing] each decree to the necessities of the case. Weinberger v. Romero-Barcelo, 456 U.S. 305, 312 (1982) (internal quotation marks omitted). Under these circumstances, it was not unreasonable for the court to conclude that the most equitable solution was to allocate the limited amount of potentially safe RRA to the farmers who had already planted that crop. 11

The Court suggests that the injunction was nonetheless too sweeping because a partial deregulation need not cause respondents any injury at all if the scope of the partial deregulation is sufficiently limited, the risk of gene flow to their crops could be virtually nonexistent. Ante , at 21. The Court appears to reach this conclusion by citing one particular study (in a voluminous record), rather than any findings of fact. 12 Even assuming that this study is correct, the Court ignores the District Courts findings that gene flow is likely and that APHIS has little ability to monitor any conditions imposed on a partial deregulation. Limits on planting or harvesting may operate fine in a laboratory setting, but the District Court concluded that many limits will not be followed and cannot be enforced in the real world. 13

Against that background, it was perfectly reasonable to wait for an EIS. APHIS and petitioners argued to the District Court that partial deregulation could be safely implemented, they submitted evidence intended to show that planting restrictions would prevent the spread of the newly engineered gene, and they contested virtually every factual issue relating to possible environmental harm. Geertson Seed Farms v. Johanns, 570 F.3d 1130, 1135 (CA9 2009). But lacking the benefit of the development of all the relevant data, App. to Pet. for Cert. 68a, the District Court did not find APHISs and petitioners assertions to be convincing. I cannot say that I would have found otherwise. It was reasonable for the court to conclude that planting could not go forward until more complete study, presented in an EIS, showed that the known problem of gene flow could, in reality, be prevented. 14

The District Courts decision that more study was needed to assess whether limits on deregulation could prevent environmental damage is further reinforced by the statutory context in which the issue arose. A courts equitable discretion must be guided by recognized, defined public policy. Meredith v. Winter Haven , 320 U.S. 228, 235 (1943) ; see also Hecht Co. v. Bowles , 321 U.S. 321, 331 (1944) (explaining that when a court evaluates an agencys decision against the background of a federal statute, the courts discretion must be exercised in light of the large objectives of the Act). Congress recognized in NEPA that complex environmental cases often require exceptionally sophisticated scientific determinations, and that agency decisions should not be made on the basis of incomplete information. Marsh v. Oregon Natural Resources Council , 490 U.S. 360, 371 (1989) . Congress also recognized that agencies cannot fully weigh the consequences of these decisions without obtaining public comments through an EIS. See Robertson v. Methow Valley Citizens Council, 490 U.S. 332, 350 (1989) . 15 While a court may not presume that a NEPA violation requires an injunction, it may take into account the principles embodied in the statute in considering whether an injunction would be appropriate. This District Court had before it strong evidence that gene transmission was likely to occur and that limits on growing could not be enforced. It also had a large amount of highly detailed evidence about whether growing restrictions, even if enforced, can prevent transmission. That evidence called into question the agencys own claims regarding the risks posed by partial deregulation. In enjoining partial deregulation until it had the benefit of an EIS to help parse the evidence, the court acted with exactly the sort of caution that Congress endorsed in NEPA.

Finally, it bears mention that the District Courts experience with the case may have given it grounds for skepticism about the representations made by APHIS and petitioners. Sometimes one judicial actor is better positioned than another to decide the issue in question. Miller v. Fenton , 474 U.S. 104, 114 (1985) . A district court may have insights not conveyed by the record. Pierce v. Underwood , 487 U.S. 552, 560 (1988) . In this case, the agency had attempted to deregulate RRA without an EIS in spite of ample evidence of potential environmental harms. And when the court made clear that the agency had violated NEPA, the agency responded by seeking to streamline the process, ante , at 18, submitting a deregulation proposal with Monsanto that suffered from some of the same legal and empirical holes as its initial plan to deregulate. Against that background, the court may have felt it especially prudent to wait for an EIS before concluding that APHIS could manage RRAs threat to the environment.

***

The District Court in this case was put in an unenviable position. Ibid . In front of it was strong evidence that RRA poses a serious threat to the environment and to American business, and that limits on RRA deregulation might not be followed or enforcedand that even if they were, the newly engineered gene might nevertheless spread to other crops. Confronted with those disconcerting submissions, with APHISs unlawful deregulation decision, with a group of farmers who had staked their livelihoods on APHISs decision, and with a federal statute that prizes informed decisionmaking on matters that seriously affect the environment, the court did the best it could. In my view, the District Court was well within its discretion to order the remedy that the Court now reverses. Accordingly, I respectfully dissent.


Notes

1 See also ante, at 1920 ([T]he District Court barred the agency from pursuing any deregulationno matter how limited the geographic area in which planting of RRA would be allowed, how great the isolation distances mandated between RRA fields and fields for growing non-genetically-engineered alfalfa, how stringent the regulations governing harvesting and distribution, how robust the enforcement mechanisms available at the time of the decision, andconsequentlyno matter how small the risk that the planting authorized under such conditions would adversely affect the environment in general and respondents in particular (emphasis deleted)).

2 See also, e.g., Railroad Commn of Tex. v. Pullman Co., 312 U.S. 496, 500 (1941) (The history of equity jurisdiction is the history of regard for public consequences. There have been as many and as variegated applications of this supple principle as the situations that have brought it into play); Seymour v. Freer, 8 Wall. 202, 218 (1869) ([A] court of equity ha[s] unquestionable authority to apply its flexible and comprehensive jurisdiction in such manner as might be necessary to the right administration of justice between the parties). Indeed, the very ground of this jurisdiction is a courts ability to give a more complete and perfect remedy. 2 J. Story, Equity Jurisprudence 924, p.225 (M. Bigelow ed. 13th ed. 1886).

3 See Steelworkers v. United States, 361 U.S. 39, 6061 (1959) (per curiam) (reviewing history of injunctions to prevent public nuisances).

4 See, e.g., Georgia v. Tennessee Copper Co., 206 U.S. 230 (1907) (air pollution); Arizona Copper Co. v. Gillespie, 230 U.S. 46, 5657 (1913) (water pollution).

5 See Reply Brief for Federal Respondents 3. There is an ongoing debate about the role of equitable adjustments in administrative law. See, e.g., Levin, Vacation at Sea: Judicial Remedies and Equitable Discretion in Administrative Law, 53 Duke L.J. 291 (2003). The parties to this appeal and the majority assume that the District Courts remedy was crafted under its equity powers, and I will do the same.

6 One of the many matters not briefed in this case is how limited a partial deregulation can be. It is not clear whether the sort of extremely limited partial deregulations envisioned by the Court, see ante, at 1923, in which RRA is deregulated in one small geographic area pursuant to stringent restrictions, could be achieved only through partial deregulation actions, or whether they could also (or exclusively) be achieved through a more case-specific permit process. Under the applicable regulations, a regulated article may still be used subject to a permitting process. See 7 CFR 340.0, 340.4 (2010). These permits prescribe confinement conditions and standard operating procedures to maintain confinement of the genetically engineered organism. Introduction of Organisms and Products Altered or Produced Through Genetic Engineering, 72 Fed. Reg. 39021, 39022 (2007) (hereinafter Introduction). Ordinarily, [o]nce an article has been deregulated, APHIS does not place any restrictions or requirements on its use. Id., at 39023. As of 2007, APHIS had nevernot oncegranted partial approval of a petition for nonregulated status. USDA, Introduction of Genetically Engineered Organisms, Draft Environmental Impact Statement, July 2007, p.11, online at http://www.aphis.usda.gov/brs/pdf/complete_eis.pdf (as visited June 18, 2010, and available in Clerk of Courts case file). In 2007, APHIS began contemplating a new system to allow for the release and use of genetically modified organisms, for special cases in which there are risks that could be mitigated with conditions to ensure safe commercial use. Introduction 39024 (emphasis added).

7 See, e.g., 40 CFR 1508.8 (2009) (determination whether an EIS is required turns on both [d]irect effects and [i]ndirect effects, and include[s] those resulting from actions which may have both beneficial and detrimental effects even if on balance the agency believes that the effect will be beneficial); 1508.27(b)(4) (determination whether an EIS is required turns on [t]he degree to which the effects on the quality of the human environment are likely to be highly controversial); 1508.27(b)(5) (determination whether an EIS is required turns on [t]he degree to which the possible effects on the quality of the human environment are highly uncertain or involve unique or unknown risks).

8 The Court posits a hypothetical in which APHIS deregulates RRA limited to a remote area in which alfalfa is not grown, and issues an accompanying order mandating isolation distances so great as to eliminate any appreciable risk of gene flow to the crops of conventional farmers who might someday choose to plant in the surrounding area. Ante, at 21. At the outset, it is important to note the difference between a plausible hypothetical and a piece of fiction. At least as of 2007, APHIS had never granted partial approval of a petition for nonregulated status. See n.6, supra. And I doubt that it would choose to deregulate genetically modified alfalfa in a place where the growing conditions and sales networks for the product are so poor that no farmer already plants it. Moreover, the notion that this imagined deregulation would pose virtually no environmental risk ignores one of the District Courts critical findings of fact: APHIS has very limited capacity to monitor its own restrictions. The agency could place all manner of constraints on its deregulation orders; they will have no effect unless they are enforced.

9 See Marsh v. Oregon Natural Resources Council, 490 U.S. 360, 372 (1989) .

10 The Court states that the order permitted both harvesting and planting. But the courts final judgment permitted only sale and harvesting of RRA planted before March 30, 2007, more than a month before the judgment. See App. to Pet. for Cert. 109a; see also id., at 79a.

11 As explained previously, I do not see the courts broad injunction as inconsistent, ante, at 20, with its decision that farmers who had already planted RRA could harvest their crop. The equities are different for farmers who relied on the agency than for companies like Monstanto that developed an organism knowing it might be regulated; and APHIS could monitor only a limited amount of RRA.

12 The Court also hypothesizes a set of growing conditions that would isolate RRA from the plaintiffs in this case, even if not from other farmers. See ante, at 2122. As already explained, these hypotheticals are rather unrealistic. See n.8, supra. And, given that the plaintiffs include environmental organizations as well as farmer and consumer associations, it is hard to see how APHIS could so carefully isolate and protect their interests. In any event, because APHIS concedes that it cannot monitor such limits, rules that protect these or any other parties may be merely hortatory in practice. Moreover, although we have not squarely addressed the issue, in my view [t]here is no general requirement that an injunction affect only the parties in the suit. Bresgal v. Brock, 843 F.2d 1163, 1169 (CA9 1987). To limit an injunction against a federal agency to the named plaintiffs would only encourage numerous other regulated entities to file additional lawsuits in this and other federal jurisdictions. Livestock Marketing Assn. v. United States Dept. of Agriculture, 207 F.Supp. 2d 992, 1007 (SD 2002), affd, 335 F.3d 711, 726 (CA8 2003).

13 The majority notes that the District Court acknowledged, at a hearing several months before it issued the judgment, that a simple but slightly overinclusive remedy may be preferable to an elaborate set of planting conditions. See ante, at 22, n.6. Quite right. As the District Court said to APHISs lawyer at that hearing, if the agency issues an elaborate set of precautions, I dont know how you even start to enforce it. App. to Pet. for Cert. 190a191a.

14 I suspect that if APHIS and petitioners had come back to the court with more convincing evidence prior to completing an EIS, and moved to modify the courts order, the court would have done so. Indeed, the District Court showed a willingness to recalibrate its order when it amended its judgment just a few months after the judgments issuance in light of APHISs submission that certain requirements were impractical. See App. to Pet. for Cert. 111a114a.

15 Accordingly, while NEPA itself does not mandate particular results, it does mandate a particular process and embodies the principle that federal agencies should carefully conside[r] detailed information before incurring potential environmental harm. Robertson, 490 U.S., at 350, 349.