In this section, the term “Administrator” means the Administrator of General Services.
The Administrator shall establish a program to accelerate the use of more cost-effective technologies and practices at GSA facilities.
As part of the program under this section, not later than 180 days after December 19, 2007, the Administrator shall establish, using available appropriations and programs implementing sections 432 and 525 [1] (and amendments made by those sections), a cost-effective lighting technology and geothermal heat pump technology acceleration program to achieve maximum feasible replacement of existing lighting, heating, cooling [2] technologies with cost-effective lighting technologies and geothermal heat pump technologies in each GSA facility. Such program shall fully comply with the requirements of sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 [1] and amendments made by those sections and any other provisions of law, which shall be applicable to the extent that they are more stringent or would achieve greater energy savings than required by this section.
To implement the program established under subparagraph (A), not later than 1 year after December 19, 2007, the Administrator shall establish a timetable of actions to comply with the requirements of this section and sections 431 through 435, whichever achieves greater energy savings most expeditiously, including milestones for specific activities needed to replace existing lighting, heating, cooling 2 technologies with cost-effective lighting technologies and geothermal heat pump technologies, to the maximum extent feasible (including at the maximum rate feasible), at each GSA facility.
The goal of the timetable under clause (i) shall be to complete, using available appropriations and programs implementing sections 431 through 435 1 (and amendments made by those sections), maximum feasible replacement of existing lighting, heating, and cooling technologies with cost-effective lighting technologies and geothermal heat pump technologies consistent with the requirements of this section and sections 431 through 435,1 whichever achieves greater energy savings most expeditiously. Notwithstanding any provision of this section, such program shall fully comply with the requirements of the Act [3] including sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 and amendments made by those sections and other provisions of law, which shall be applicable to the extent that they are more stringent or would achieve greater energy or water savings than required by this section.
The plan shall implement measures required by such other provisions of law in accordance with those provisions, and shall implement the measures required by this section to the maximum extent feasible (including at the maximum rate feasible) using available appropriations and programs implementing sections 431 through 435 and 525 1 (and amendments made by those sections), by not later than the date that is 5 years after December 19, 2007.
Notwithstanding any provision of this section, the program required under this section shall fully comply with the requirements of sections 321 through 324, 431 through 438, 461, 511 through 518, and 523 through 525 1 and amendments made by those sections, which shall be applicable to the extent that they are more stringent or would achieve greater energy or water savings than required by this section.