Ill. Admin. Code tit. 62, § 1816.104 - Backfilling and Grading: Thin Overburden
In surface coal mining which is carried out at the same location over a substantial period of time where the operation transects the coal deposit and where the thickness of the coal deposit relative to the thickness of the overburden is large and where the operator demonstrates that the spoil and other waste materials available from the entire permit area are insufficient, giving due consideration to volumetric expansion, to restore the disturbed area to its approximate original contour, the operator shall, at a minimum:
Notes
Amended at 11 Ill. Reg. 8131, effective July 1, 1987
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.