210 IAC 8-4-31 - Alternative power source
Authority: IC 11-8-2-5; IC 31-31-8-2
Affected: IC 31-31-8
Sec. 31.
(a) Written
policy, procedure, and practice provide that the facility has:
(1) an alternate power source, such as a
generator, to maintain essential services in an emergency; and
(2) an active, effective physical plant
maintenance program that includes the following:
(A) A proactive, written preventive
maintenance plan.
(B) Provisions
for emergency repair in life threatening situations.
(C) A reporting or work order request and
response system to document and track needed repairs.
(D) Weekly power generator tests and
inspections.
(E) Annual load
test.
(b) This
is a mandatory standard.