312 IAC 29-20-8 - Production casing
Authority: IC 14-10-2-4; IC 14-37-3
Affected: IC 14-37
Sec. 8.
(a) An owner
or operator shall set and cement production casing according to the
requirements of this section unless an alternate well construction method is
authorized under section 10 of this rule.
(b) Except as provided in subsection (c),
production casing shall be set at the bottom of the hole or at the top of the
last stratum drilled unless the well is plugged back to a shallower formation.
The production casing shall be circulated with cement from the setting depth to
a level at least twenty-five (25) feet inside the next largest diameter
cemented casing string.
(c) A well
drilled for production from the either the Trenton formation or the Black River
formation in the shallow Trenton limestone reservoir region may be completed
without an additional string of production casing provided that surface casing
meeting the requirements of section 6(f) of this rule has been set in the well.
In the event that formations between the bottom of the surface casing string
and the producing Trenton or Black River interval are water-bearing, the well
may be constructed using one (1) of the following:
(1) With production casing run through an
open hole packer set between the water-bearing interval and the producing
interval.
(2) By isolation of the
water-bearing interval by setting an additional casing string cemented with at
least one hundred (100) feet of cement above the water-bearing
interval.