329 IAC 10-38-4 - Post-closure certification
Authority: IC 13-14-8-7; IC 13-15-2-1; IC 13-19-3-1
Affected: IC 13-30-2; IC 36-9-30
Sec. 4.
When the post-closure care requirements of this rule have been completed, the owner or operator of a restricted waste site Type III or a construction/demolition site shall submit a certification statement signed by both the owner or operator and a registered professional engineer that the post-closure care requirements have been met and the facility has stabilized. The post-closure certification will be deemed adequate unless within one hundred fifty (150) days of receipt of the post-closure certification, the commissioner issues notice of the deficiency of post-closure, including actions necessary to correct the deficiency.