Kan. Admin. Regs. § 4-4-950 - Time frames for submission of initial diagram or plans

(a) Within one year after the effective date of this regulation, the owner of each existing or proposed storage facility shall submit a diagram or plans of the storage facility containing the following information:
(1) the location and size of each storage container;
(2) the drainage pattern of the storage facility;
(3) any source of drinking water within the facility, if any;
(4) any source of ground or surface water within 1320 feet of the storage facility, if any;
(5) any tank or other container used for the storage of petroleum products within the storage facility, if any;
(6) the location of each pump, pipe or other appurtenance used in the storage or transfer of fertilizer within the storage facility, if any;
(7) the location of each pad used for the loading of bulk fertilizer, if any; and
(8) the location of the storage facility for the dry fertilizer, if any;
(9) the standards and specifications for the construction of the storage facility for dry fertilizer, if any;
(10) the size and location of each proposed secondary containment structure to be located within the storage facility to comply with the requirements of K.A.R. 4-4-900 et seq.;
(11) the size and location of each proposed loading pad or area to be located within the storage facility to comply with the requirements of K.A.R. 4-4-900 et seq.; and
(12) any other information required by the secretary.
(b) The diagram shall be drawn to an appropriate scale which permits all required information to be shown and be easily readable without magnification.

Notes

Kan. Admin. Regs. § 4-4-950
Authorized by and implementing K.S.A. 1989 Supp. 2-1227; effective Jan. 14, 1991.

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.