Md. Code Regs. 26.13.07.02-8 - Specific Information Requirements for Landfills
A. In addition to complying with the
requirements of Regulation .02 of this chapter, a person seeking a CHS facility
permit to incinerate hazardous waste shall provide the Secretary with the
specific information required by §§B and C of this regulation.
B. For facilities that dispose of hazardous
waste in landfills, except as otherwise provided in COMAR
26.13.05.01, the permit applicant
shall provide the following information:
(1)
A list of the hazardous wastes placed or to be placed in each landfill or
landfill cell;
(2) A detailed plan
and an engineering report that:
(a) Describe
how the landfill is or will be designed, constructed, operated, and maintained
to comply with the requirements of COMAR
26.13.05.02-2 and 14B;
and
(b) Provide information on the
following items as specified in COMAR
26.13.05.14B:
(i) The liner system and leachate collection
and removal system, except for an existing portion of landfill;
(ii) If an exemption from the requirements
for a liner and a leachate collection and removal system is sought as provided
by COMAR 26.13.05.14B(2) or
(4), detailed plans and engineering
hydrogeologic reports as appropriate, describing alternate design and operating
practices that will, in conjunction with location aspects, prevent the
migration of any hazardous constituents into the ground water or surface water
at any future time;
(iii) Control
of run-on;
(iv) Control of
run-off;
(v) Management of
collection and holding facilities associated with run-on and run-off control
systems; and
(vi) Control of wind
dispersal of particulate matter, when applicable;
(3) A description of how each landfill,
including the double liner system, leachate collection and removal system, leak
detection system, cover system, and appurtenances for control of run-on and
run-off will be inspected in order to meet the requirements of COMAR
26.13.05.14C(1) -
(4) as part of the inspection plan submitted
under Regulation .02D(19) of this chapter;
(4) Detailed plans and an engineering report
describing the final cover which will be applied to each landfill or landfill
cell at closure in accordance with COMAR
26.13.05.14J(1),
and a description of how each landfill will be maintained and monitored after
closure in accordance with COMAR
26.13.05.14J(2)
as part of the closure and post-closure plans submitted under Regulation
.02D(29) of this chapter;
(5) If
food-chain crops are to be grown, and cadmium is present in the land treated
waste, a description of how the requirements of COMAR
26.13.05.13G(5)
will be complied with;
(6) A
description of the vegetative cover to be applied to closed portions of the
facility, and a plan for maintaining the cover during the post-closure care
period, as required under COMAR
26.13.05.13K(1)(h) and
(3)(b). This information should be included
in the closure plan and, when applicable, the post-closure care plan submitted
under Regulation .02D(29) of this chapter;
(7) If ignitable or reactive wastes will be
placed in or on the treatment zone, an explanation of how the requirements of
COMAR 26.13.05.13L will
be complied with;
(8) A waste
management plan for EPA Hazardous Waste Nos. F020, F021, F022, F023, F026, and
F027 that:
(a) Describes how a landfill is or
will be designed, constructed, operated, and maintained to meet the
requirements of COMAR
26.13.05.14P;
and
(b) Addresses the:
(i) Volume, physical characteristics, and
chemical characteristics of the wastes, including their potential to migrate
through soil or to volatilize or escape into the atmosphere;
(ii) Attenuative properties of underlying and
surrounding soils or other materials;
(iii) Mobilizing properties of other
materials co-disposed with these wastes; and
(iv) Effectiveness of additional treatment,
design, or monitoring techniques;
(9) If the leak detection system is located
in a saturated zone, detailed plans and an engineering report explaining the
leak detection system's design and operation, and the location of the saturated
zone in relation to the leak detection system;
(10) The construction quality assurance plan
required by COMAR
26.13.05.02-2;
(11) If required under COMAR
26.13.05.14E, a
proposed action leakage rate with rationale and supporting information;
and
(12) If required under COMAR
26.13.05.14F, a
response action plan.