Nev. Admin. Code § 459.953451 - Application for permit to construct: Submission; contents; requirements for accompanying documents, specifications and calculations
1.
To obtain a permit to construct a new process subject to C.A.P.P., an owner or
operator of a new process must submit to the Division a complete application
for a permit to construct. The Division shall determine which elements of the
application, if any, will be reviewed at the site where the new process will be
located.
2. An application for a
permit to construct a new process must be made on a form prescribed by the
Division and include:
(a) Registration for
the process that includes:
(1) The
information required by NAC
459.9535;
(3) The name, address and telephone number of
the person submitting the plans;
(4) An overview of the project that includes
a description of:
(I) The process;
(II) The hours of operation during which the
process will be operated;
(III) The
estimated number of personnel, for each shift, who will be working on the
process, including, without limitation, personnel in operations, personnel in
maintenance, office staff, contract personnel and any other
personnel;
(IV) The modes,
frequency and hours of transportation of the incoming and outgoing raw
materials and products;
(V) The
scope of the construction; and
(VI)
The schedule for the project; and
(5) Information concerning the inspectors of
the construction required pursuant to NAC
459.953461;
(b) A coordinated emergency response plan
document developed pursuant to NAC
459.9544 and
459.95442;
(c) Information concerning the process and
safety process hazard analysis required pursuant to NAC
459.953455;
(d) Documents, specifications and
calculations required pursuant to NAC
459.953457,
459.953459 and
459.95346; and
(e) A copy of the conditional use permit
issued pursuant to NRS 278.147.
3. Documents, specifications and calculations
submitted pursuant to NAC 459.953457, 459.953459 and 459.95346 must:
(a) Be stamped or sealed in accordance with
chapter 625 of NRS, and any regulations adopted pursuant thereto, by the
engineer who has responsible charge of the document, specification or
calculation; and
(b) Include a
table of contents or cover sheet that complies with the requirements of chapter
625 of NRS and any regulations adopted pursuant thereto.
Notes
NRS 459.3818, 459.3829