25 Pa. Code § 288.112 - Facility plan

An application to operate a residual waste landfill shall contain conceptual drawings and a narrative describing the following:

(1) The general operational concept for the proposed facility, including the origin, composition and weight or volume of solid waste that is proposed to be disposed of at the facility, the type of liner system, the proposed capacity of the facility, the expected life of the facility and the size, sequence and timing of solid waste disposal operations at the facility.
(2) A detailed description of the volume of soil needed to construct and operate the facility and the method by which the soil will be delivered. The description will include the number of trucks, the access roads they will use, delivery times and any other information relevant to assessing the impacts of the operation.

Notes

25 Pa. Code § 288.112
The provisions of this § 288.112 amended January 12, 2001, effective 1/13/2001, 31 Pa.B. 235.

This section cited in 25 Pa. Code § 288.111 (relating to basic requirements).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.