25 Pa. Code § 297.102 - Operating plan
An application shall contain:
(1) A narrative description of the general
operating plan for the proposed facility, including the origin, composition and
weight or volume of solid waste that is proposed to be processed at the
facility, the process to be used at the facility, the daily operational
methodology of the proposed process, the loading rate, the proposed capacity of
the facility and the expected life of the facility.
(2) A plan for an alternative waste handling
or disposal system during periods when the proposed facility is not in
operation, including procedures to be followed in case of equipment breakdown.
Procedures may include the use of standby equipment, extension of operating
hours and contractual agreements for diversion of residual waste to other
facilities.
(3) An operational
safety, fire prevention and emergency response plan that will adequately
protect workers and patrons of the facility, prepared by an expert in the field
of industrial hygiene and safety.
(4) A plan for assuring that solid waste
received at the facility is consistent with §
297.201 (relating to basic
limitations).
(5) A plan for
training equipment operators and other personnel concerning the operation and
approved design of the facility.
(6) The proposed operating hours of the
proposed facility.
(7) A narrative
describing the procedures for inspection and monitoring of incoming
waste.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.