25 Pa. Code § 71.52 - Content requirements-new land development revisions
(a) An official plan revision for new land
development shall be submitted to the Department in the form of a completed
sewage facilities planning module provided by the Department and shall include,
but not be limited to, the following information:
(1) The nature of the proposal, including:
(i) Type of facilities to be served, density
of proposed development and whether the development is residential, commercial
or industrial.
(ii) Number of lots
including equivalent dwelling units.
(iii) Anticipated sewage flow from the
proposed development. For individual or community sewerage systems, the flows
shall be based on gauged flows or the flows contained in the Department's
Sewerage Manual. A copy of the manual may be obtained from the Department's
Bureau of Water Supply and Wastewater Management. For individual or community
onlot sewage systems, the flows shall be consistent with §§
73.16 and
73.17 (relating to absorption area
requirements; and sewage flows).
(iv) Anticipated raw waste characteristics of
the sewage.
(v) Type of sewage
facilities proposed, including collection, treatment and disposal
methods.
(vi) Description of
required operation and maintenance activities required by Subchapter E
(relating to sewage management programs).
(vii) Designation of the person responsible
for operation and maintenance activities and the legal and financial
arrangements necessary for assumption of this responsibility.
(2) The relationship of the
proposed development to existing sewage needs, proposed sewage facilities and
sewage management programs in an area delineated by the municipality, including
identification of:
(i) The areas included in,
and adjacent to, the project which are in need of improved sewage
facilities.
(ii) Existing and
proposed sewage facilities for remaining acreage or delineated lots not
included in the project.
(iii)
Existing sewage facilities and sewage management programs in the
area.
(iv) Other proposed sewage
facilities and sewage management programs-public and private-in the
area.
(v) The method for
integrating the proposal into the comprehensive sewage program in the area as
reflected in the approved official plan.
(3) An analysis of technically available
sewage facilities alternatives identified by the municipality and additional
alternatives identified by the Department, including whether each alternative:
(i) Meets the technical requirements of this
part.
(ii) Is consistent with local
and areawide comprehensive water quality management plans for the
area.
(iii) Is consistent with
sewage planning policies and decisions of the municipality.
(iv) Is consistent with the municipalities'
comprehensive land use plan for the area.
(4)
Selection of an alternative which adequately addresses both the present and
future sewage needs of the proposal, through identification and evaluation of:
(i) Interim facilities.
(ii) Replacement facilities.
(iii) Ultimate facilities.
(iv) Operation and maintenance activities and
requirements.
(5)
Selection of an alternative which assures the continued operation and
maintenance of the selected sewage facilities through evaluation and
identification of the following:
(i) Sewage
management program requirements.
(ii) Administrative capability for continued
operation and maintenance.
(6) Documentation of whether or not it may be
implemented including:
(i) Agreements with
sewer authorities, water authorities or other persons to provide services
necessary for implementation of the plan.
(ii) Designation of the institutional
arrangements necessary for implementation of the plan.
(b) The Department may require
additional information which is necessary for adequate review of the
proposal.
Notes
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.
No prior version found.