25 Pa. Code § 89.132 - Soil stockpiling
If not utilized immediately, the A horizon specified in § 89.131(b) (relating to soil removal) and the B horizon or other suitable soil materials specified in § 89.131(c) and (d) shall be stored separately from each other and from spoil. These stockpiles shall be placed within the permit area where they are not disturbed or exposed to excessive water or wind erosion before the stockpiled horizons can be redistributed. Stockpiles in place for more than 30 days shall meet the requirements of § 89.22(e) (relating to topsoil removal and storage).
State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.