A. Use of Meters -- Gas sold by utilities
shall be metered through approved meters except in case of emergency, or when
otherwise authorized by the Commission as provided in
R746-100-15, Deviation from
Rules. Meters shall bear an identifying number and shall be plainly marked to
show the units of the meter index. When gas is delivered at higher than
standard pressure, the contract, rate schedule, or gas bill shall specify the
method to be used to correct the gas volume to standard pressure.
B. Meter Location -- Meters may be located
either inside or outside of buildings. The locations selected by utilities and
provided by customers shall be convenient for inspection and reading of the
meters and shall comply with
49 CFR
192.353,
192.355,
192.357,
incorporated by reference.
C. Meter
Accuracy at Installation -- New meters and reinstalled meters shall be no more
than one percent fast or two percent slow.
D. Initial Tests of Meters -- Meters shall be
tested and meet the foregoing accuracy limits before installation. When meters
are placed into service, the meter index reading shall be recorded.
E. Periodic Tests of Meters --
1. Utilities shall adopt schedules for
periodic tests and repairs of positive displacement meters. Utilities shall
keep records of accuracy of meters periodically tested and shall analyze the
records to determine meter service life for purposes of adjusting the periods
for testing and servicing meters.
2. Unless a time extension or a statistical
sampling method is approved by the Commission, meter test intervals for
displacement meters of the following rated capacities shall not exceed the
following:
|
TABLE |
||
|
a. |
To 300 cu. ft./hr |
10 yrs |
|
b. |
300 to 600 cu. ft./hr |
5 yrs |
|
c. |
600 to 1,500 cu. ft./hr |
3 yrs |
|
d. |
Over 1,500 cu. ft./hr |
2 yrs |
|
e. |
Orifice Meters, inspected and checked for accuracy |
1 yr |
F. Meter Tests by Request --
1. Upon written request, utilities shall test
a customer's meter promptly. If a meter has been tested within 12 months
preceding the date of the request, the utility concerned may require the
customer to make a deposit to defray the costs of the test. If the meter is
found to be more than three percent inaccurate, either over or under, the
deposit shall be refunded; otherwise the deposit may be processed by the
utility as a service charge. The deposit shall not exceed the estimated cost of
performing the test.
2. The
customer shall be entitled to observe the test and the utility shall forward a
copy of the written report of the test to the customer.
G. Referee Meter Tests -- If there is a
dispute over a test, the customer concerned may request a referee test in
writing. The Commission may require the deposit of a testing fee in connection
with a referee test to defray costs of the test. Upon filing of the request and
receipt of the deposit, if needed, the Commission shall notify the utility and
the utility shall not remove the meter until the Commission so instructs. The
meter shall be tested in the presence of the Commission's representative, and
if the meter is found to be more than three percent inaccurate, the customer's
deposit may be refunded; otherwise it may be kept.
H. Billing Adjustments for Meter Variance --
1. If a meter tested pursuant to Subsections
R746-320-3(E) and
(F) is more than three percent fast, there
shall be refunded to the customer the amount billed in error for one-half the
period since the last test. The one- half period shall not exceed six months
unless it can be shown that the error was due to some cause, the date of which
can be fixed. In this instance, the overcharge shall be computed back to, but
not beyond, that date.
2. If a
meter tested pursuant to Subsections
R746-320-3(E) and
(F) is more than three percent slow, the
utility may bill the customer in an amount equal to the unbilled error for
one-half the period since the last test, that one-half period shall not exceed
six months.
3. When there is a
nonregistering meter, the customer may be billed on an estimate based on
previous bills for similar usage. The estimated period shall not exceed three
months.
4. When there is
unauthorized use, the customer may be billed on a reasonable estimate of the
gas consumed.
I.
Standard Meter Test Methods -- Meter tests shall be made by trained personnel
using approved methods and testing equipment. The methods and apparatus
recommended in the Gas Displacement Standard, Second Edition 1985, published by
the American Gas Association and incorporated by this reference, may be used to
satisfy this rule.
J. Meter Testing
Equipment -- Utilities shall own and maintain, or have access to, at least one
five- cubic-foot prover of an approved type, as well as other equipment
necessary to test meters. Meter testing equipment shall be installed in a meter
testing station designed for that purpose.
K. Records of Meter Tests -- Utilities shall
record the original data of meter tests on standard forms and preserve the data
until the next time meters are tested.
L. Meter Records -- Utilities shall keep
permanent records of their meters. Utilities shall start a record for each
meter when purchased and include the date of purchase, identification number,
manufacturer's name, type, and rating. Utilities shall keep records of any
tests, adjustments, and repairs. Utilities shall keep records of meter readings
when the meters are installed or removed from service together with the
addresses of customers served. The meter records shall be systematically kept
and filed until the meters are retired.