25 Pa. Code § 105.98 - Design flood criteria

The discharge capacity or storage capacity, or both, must be capable of safely accommodating the recommended design flood for the dam as classified under § 105.91 (relating to classification of dams and reservoirs). The design flood must be determined by an incremental dam breach analysis. The minimum required design storm duration is 24 hours. When considered appropriate by the Department, engineering judgment may be used to determine the design flood within the design flood range indicated below for dams of Hazard Potential Category 3 or 4. The classification or damage, or both, resulting from dam failure will determine the design flood within the design flood range.

Classification Design Flood Range
A-3, B-3 1/2 PMF to PMF
A-4, B-4, C-3 100 year to 1/2 PMF
C-4 50 year to 100 year frequency

Notes

25 Pa. Code § 105.98
The provisions of this § 105.98 adopted September 26, 1980, effective 9/27/1980, 10 Pa.B. 3843; amended January 7, 2011, effective 1/8/2011, 41 Pa.B. 219.

The provisions of this § 105.98 amended under section 5 of the Dam Safety and Encroachments Act (32 P. S. § 693.5).

This section cited in 25 Pa. Code § 105.94 (relating to spillways).

State regulations are updated quarterly; we currently have two versions available. Below is a comparison between our most recent version and the prior quarterly release. More comparison features will be added as we have more versions to compare.


No prior version found.