Subchapter 23 - TECHNICAL REQUIREMENTS FOR TREATMENT WORKS APPROVAL APPLICATIONS
- § 7:14A-23.1 - Purpose
- § 7:14A-23.2 - Scope
- § 7:14A-23.3 - Projected flow criteria
- § 7:14A-23.4 - Plans and specifications submitted to the Department with treatment works approval applications
- § 7:14A-23.5 - Engineering design reports to be submitted to the Department with treatment works approval applications
- § 7:14A-23.6 - Sanitary sewer design
- § 7:14A-23.7 - Inverted siphons
- § 7:14A-23.8 - Manholes
- § 7:14A-23.9 - Outfalls
- § 7:14A-23.10 - Wastewater pumping stations
- § 7:14A-23.11 - Submersible wastewater pumps
- § 7:14A-23.12 - Dry wells and wet wells
- § 7:14A-23.13 - Wastewater treatment plants
- § 7:14A-23.14 - Measuring, recording, and sampling requirements at treatment plants
- § 7:14A-23.15 - Screening and comminution
- § 7:14A-23.16 - Grit removal equipment
- § 7:14A-23.17 - Settling tanks
- § 7:14A-23.18 - Chemical coagulation
- § 7:14A-23.19 - Trickling filters
- § 7:14A-23.20 - Rotating biological contactors
- § 7:14A-23.21 - Activated sludge
- § 7:14A-23.22 - Intermittent sand filters
- § 7:14A-23.23 - Chlorination
- § 7:14A-23.24 - Dechlorination
- § 7:14A-23.25 - Ultraviolet disinfection
- § 7:14A-23.26 - Anaerobic sludge digestion and management
- § 7:14A-23.27 - Sludge pumps
- § 7:14A-23.28 - Drying beds for residuals
- § 7:14A-23.29 - Residual dewatering lagoons
- § 7:14A-23.30 - Mechanical dewatering of residuals
- § 7:14A-23.31 - Stabilization residuals
- § 7:14A-23.32 - Storage of residuals or septage; and septage handling
- § 7:14A-23.33 - New treatment methods and technologies
- § 7:14A-23.34 - Closure requirements for wastewater treatment units